STEP 30:
•Route the LEG CABLE (45) through the SWIVEL (14) and assemble two 4-1/2” PULLEYS (38) to the SWIVEL (14) using four BLACK RH CAPS (77), two 3/8 X 1-3/4” BOLTS (62), four 3/8” SAE WASHERS (75), four 3/8” RH WASHERS (76) and two 3/8” LOW HEIGHT LOCK NUTS (73) as shown in FIGURE 30.
•Route the LEG CABLE (45) around one 4-1/2” PULLEY (38) and assemble the PULLEY (38) and the PULLEY GUARD (22)to
the PIVOT ARM (9) using two RH CAPS (78), one 3/8 X 1-3/4” BOLT (62), two 3/8” SAE WASHERS (75), two 3/8” RH WASHERS (76) and one 3/8” LOW HEIGHT LOCK NUT (73) as shown in FIGURE 30.
| 38 |
| 1 |
| 73 |
3/8 62 | 45 |
X 1-3/4” | 76 |
(43 m) | |
78 | |
| 75 |
FIGURE 31 |
STEP 31:
•Route the LEG CABLE (45) around a 4-1/2” PULLEY (38) and assemble it to the bracket on the BASE (1) using four RH CAPS (78), two 3/8 X 1-3/4” BOLTS (62), four 3/8” SAE WASHERS (75), four 3/8” RH WASHERS (76) and two 3/8” LOW HEIGHT LOCK NUTS (73) as shown in FIGURE 31.