INTRODUCTION | A S S E M B LY STEP 8 |
| |
HARDWARE BAG 7 CONTENTS : |
A S S E M B LY STEP 9
INTRODUCTION
CABLE B
Qty: 1
PRECAUTIONS |
|
|
|
IMPORTANT | NYLON NUT (C) |
|
|
| FLAT WASHER (B) |
| |
|
| CLEVIS |
|
|
| BALL | CABLE B |
|
| RUBBER STOP |
|
ASSEMBLY |
| FLAT WASHER (B) |
|
|
|
| |
|
| SCREW (E) |
|
YOU | HOOK |
|
|
BEFORE |
|
| |
GRIP |
|
| |
BEGIN |
|
|
|
CONDITIONING |
|
|
|
GUIDELINES |
|
|
|
|
|
|
| A | Open HARDWARE BAG 7. |
| TROUBLESHOOTING |
|
| ||
|
|
| B | Remove nylon nut, threaded screw and ball from end of CABLE B. | |
| & |
|
| ||
| MAINTENANCE |
|
| C | Route CABLE B through the pulley system in the RADIAL ARM ASSEMBLY as shown in |
|
|
|
| ||
|
|
|
|
| diagram. |
|
|
|
| D | After CABLE B routing is complete replace nylon nut, threaded screw and ball on end of |
|
|
|
|
| cable. |
| WARRANTY |
| E | Hook HANDLES on to cable using the 2 HOOKS. | |
|
|
|
| ||
| LIMITED |
|
|
| |
| 14 |
|
| ||
|
|
|
|
| |
|
|
|
|
|
|
HARDWARE BAG 8 CONTENTS :
CABLE C
Qty: 1
| SINGLE FLOATING | |
| PULLEY BRACKET | |
| LEG EXTENSION/ | |
| CURL DOWN TUBE | |
| CABLE SCREW | |
CABLE C |
| |
| FLAT | |
NYLON | WASHER (B) | |
BALL | ||
NUT (C) | ||
| RUBBER STOP | |
| CLEVIS | |
| FLAT WASHER (B) | |
| SCREW (E) | |
EXTENSION | HOOK | |
CABLE | ||
|
AOpen HARDWARE BAG 8.
BRemove nylon nut, threaded screw and ball from end of
CABLE C.
CAttach threaded cable end to SINGLE FLOATING PULLEY BRACKET.
DRoute CABLE C through pulley system of BASE FRAME up through the DUAL FLOATING PULLEY BRACKET and back to BASE FRAME and CENTER SUPPORT FRAME as shown in diagram.
EAfter CABLE C routing is complete replace nylon nut, threaded screw and ball on end of cable.
FHook the LEG EXTENSION/CURL DOWN TUBE to the end of the cable using the HOOK and the
EXTENSION CABLE.
PRECAUTIONS
IMPORTANT
ASSEMBLY
YOU BEGIN
BEFORE
GUIDELINES
CONDITIONING
TROUBLESHOOTING & MAINTENANCE
| WARRANTY | |
| LIMITED | |
15 | ||
| ||
|
|
FS 40 rev 1.0.indd | 8/20/07 11:37:15 AM |