ASSEMBLY
Step 6:
ROUTING THE LOWER CABLE:
assembly
Attach the Single Pulley Block (210) to the Base Frame (1) using two 3/8" x 3" Hex Head Bolts (230), four 3/8" Washers (236) and two 3/8" Nylon Nuts (238) as shown in FIG G3.
To fit the Lower Cable (36) correctly you will need to add some slack to the cable. Adjust the slack in the cable by adjusting the pulley T7, L4 positions on the Adj Floating Pulley Block (22) as shown in FIG T7,L4.
Route the Lower Cable (36) beneath pulley G1, up and around pulley G2, down and through pulley G3 and L3. Attach the various pulleys as shown.
LOWER CABLE (36)
T7 |
L4 |
instructions
| 35 |
77 |
|
75 | 68 |
| |
38 | 75 |
| |
| 36 |
| |
229 |
|
| 206 |
| 238 |
214 | 207 |
|
|
| |
230 |
| 3 |
|
| |
236 |
|
|
223 | 236 | |
215 |
| 238 |
|
| |
| 223 |
|
215 | ||
| 231 | 230 |
238 |
| 236 |
1 |
|
|
236 | 210 | 36 |
| ||
|
|
36 |
|
G2 | L2 |
| |
G3 |
|
L3 |
|
| G1 |
| LOWER CABLE PATH |
|