Spalding M8872411 manual End of the rod 14 as shown Figure a

Page 14

13.

Before starting rim assembly, tighten nut (26) until it is positioned 6-3/4” from

the end of the rod (14) as shown (Figure A).

 

Remove rim cover (16), attach rim assembly (3) to backboard (10) and reattach rim cover (16).

** For rim assembly, see instructions included with rim.

14 26

FIGURE

A.

5

6

6

10

IMPORTANT!

Carefully cut and peel protective film away from board prior to attaching rim.

Rim Assembly

3

15

15

8 7

16

Refer To Instructions

Included With Rim

Hardware For Rim

Assembly.

ID# M8872411

09/05

14

Image 14
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Side V IEW Build drainage hillInsert bushings 38 into areas ShownPlaying Surface Mounting plate 2 as shownCompleted Assembly ID# M8872411 09/05 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Yokes 18 Using TWO people to hold the boardAttach backboard 10 to upper and lower First attach board 10 to upper yokeEnd of the rod 14 as shown Figure a Install net 4 to rim as shown Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators To lower yoke in areaNing 09/05 ID# M8872411 Check system leveling. Pole Should be level in all directionsLimited Lifetime Warranty