Spalding manual 09/05 ID# M8872411

Page 17

17. After pole has been secured to anchor plate (2) loosen nut (26), remove cotter pin (37), and pull out pin (36). This will allow the removal of the threaded assembly rod (14) which is no longer necessary for the remainder of the assembly and installation of system.

25

WARNING!

ONLY AFTER THE ANCHOR PLATE HAS BEEN FULLY TIGHTENED: Remove cotter pin (37) and pin (36) to remove threaded assembly rod (14) from anchor plate (2).

26

24

35

14

37

36

17

09/05

ID# M8872411

Image 17
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Build drainage hill Side V IEWShown Insert bushings 38 into areasMounting plate 2 as shown Playing SurfaceCompleted Assembly ID# M8872411 09/05 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Attach backboard 10 to upper and lower Using TWO people to hold the boardYokes 18 First attach board 10 to upper yokeEnd of the rod 14 as shown Figure a Attach height indicators Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown To lower yoke in areaNing 09/05 ID# M8872411 Should be level in all directions Check system leveling. PoleLimited Lifetime Warranty