Spalding M8872411 manual Completed Assembly

Page 9

8.

TWO people are required to lift pole into position so that the threaded assembly rod (14) can be installed and secured by the THIRD person.

While pole is being supported by TWO capable adults, position rod (14) and lock into place with hitch pin (36) and cotter pin (37).

Slide barrel washer (35) onto other end of rod (14) and secure with washer (24) and nut (26). Tighten nut (26) until it is positioned 3-3/4” from the end of the rod (14) as shown (Figure A).

26

24

1

35

WARNING!

THREE PEOPLE

REQUIRED FOR THIS

PROCEDURE. FAILURE

TO FOLLOW THIS

WARNING COULD RESULT

IN SERIOUS INJURY

AND/OR PROPERTY

DAMAGE.

Completed Assembly

1

14 37

36

26

FIGURE

A.

14

9

09/05

ID# M8872411

Image 9
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Build drainage hill Side V IEWShown Insert bushings 38 into areasMounting plate 2 as shown Playing SurfaceCompleted Assembly ID# M8872411 09/05 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Attach backboard 10 to upper and lower Using TWO people to hold the boardYokes 18 First attach board 10 to upper yokeEnd of the rod 14 as shown Figure a Attach height indicators Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown To lower yoke in areaNing 09/05 ID# M8872411 Should be level in all directions Check system leveling. PoleLimited Lifetime Warranty