Spalding M8872411 manual Ning

Page 16

16.

WARNING!

THREE PEOPLE REQUIRED FOR THIS

PROCEDURE.: TWO PEOPLE ARE REQUIRED TO

GUIDE AND SUPPORT THE SYSTEM WHILE THE

THIRD PERSON IS TIGHTENING NUT (26) TO

RAISE THE SYSTEM UPRIGHT.

FAILURE TO FOLLOW THIS WARNING COULD

RESULT IN SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

Upright pole (1) by tightening nut (26). Using 15/16” wrench, turn nut (26) clockwise to begin standing pole upright. Continue to turn nut (26) until pole has come to rest against washers (24) and pole is vertical.

Once pole is in its final position, install washers (24) and nuts (25) onto J-bolts (19) and fully tighten to secure pole to anchor plate (2).

1

WARNING!

WAR

NING

1

24

26

24

2

7

THREE PEOPLE

REQUIRED FOR THIS

PROCEDURE. FAILURE

TO FOLLOW THIS

WARNING COULD RESULT

IN SERIOUS INJURY

AND/OR PROPERTY

DAMAGE.

25

24

G

IN E

Y C

A FA

L R

P U

S

ID# M8872411

09/05

16

Image 16
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Side V IEW Build drainage hillInsert bushings 38 into areas ShownPlaying Surface Mounting plate 2 as shownCompleted Assembly ID# M8872411 09/05 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Using TWO people to hold the board Attach backboard 10 to upper and lower Yokes 18 First attach board 10 to upper yokeEnd of the rod 14 as shown Figure a Apply height indicator labels 32 & 31 to height indicators Attach height indicatorsInstall net 4 to rim as shown To lower yoke in areaNing 09/05 ID# M8872411 Check system leveling. Pole Should be level in all directionsLimited Lifetime Warranty