7. Attach the Base Cover (84) to the Base (94) | 7 |
|
|
|
|
|
|
|
with four #8 x 1/2" Screws (1). Be careful not |
|
|
|
|
|
|
| |
to overtighten the Screws. |
|
|
|
|
|
|
|
|
With the help of a second person, tip the tread- | 84 |
| 1 |
|
|
|
| |
mill so that the Base (94) is flat on the floor. |
|
|
|
|
| |||
|
| 1 | 94 |
|
|
|
| |
|
|
|
|
|
|
| ||
|
| 1 |
|
|
|
|
|
|
|
|
| 1 |
|
|
|
|
|
8. Identify the Left Handrail (78). Slide a Handrail | 8 |
|
|
|
|
|
|
|
Cover (77) onto the lower end of the Left |
|
|
|
|
|
|
| |
Handrail. Remove the tie from the bracket on |
|
|
|
|
|
|
|
|
the Left Handrail. If necessary, press the Cage |
|
|
|
|
| Tie |
|
|
Nut (not shown) back into place. |
| 78 |
|
|
| 4 |
| |
Insert the bracket on the Left Handrail (78) into |
|
|
|
|
|
| ||
the top of the Left Upright (82) and at the same |
|
|
|
| Bracket |
| 9 |
|
time slide the lower end of the Left Handrail onto |
|
|
|
|
| 5 | ||
the bracket on the Left Upright. |
|
|
|
| 82 |
|
| |
Start two 5/16" x 3/4" Patch Bolts (5) and two |
|
|
| 8 |
|
|
| |
5/16" Star Washers (9) into the Left Upright (82) |
|
|
|
|
|
|
| |
and the Left Handrail (78). Then, start a 5/16" x |
|
|
|
|
|
|
|
|
1 1/2" Patch Bolt (4). Do not tighten the Patch |
|
|
|
|
|
|
|
|
Bolts yet. |
|
| 77 |
|
|
|
|
|
Start a 1/4" x 1/2" Patch Bolt (8) into the lower |
|
|
|
|
|
|
| |
end of the Left Handrail (78). Tighten all four |
|
|
| Bracket |
|
|
| |
Patch Bolts used in this step. Slide the |
|
|
|
|
|
| ||
Handrail Cover (77) against the Left Upright |
|
|
|
|
|
|
|
|
(82). |
|
|
|
|
|
|
|
|
| 10 |
|
|
|
|
|
|
|