ProSpot Fitness PC-1000 manual STEP# 1 Mainframeassembly

Page 3

lnstructionsforAssemblyof the PROSPOTItnessrMPC-1000

. Beforeassembly,choosea safe locationfor your PROSPOFJitnessrMPC-1000.The PROSPOTlrressrMPC-

'10006'.The barbell is approximately7' long. Locate your has a footprintof approximately6'x

PROSPOTlrressrMPC-'000awayfromany sourceof water.Do notallowany liquidto be nearthe machine or spilledon anyelectricalpart. Do notinsertanyobjectintothe electricalbox.

. Approximateassemblytimeis 1/2hours.

oA flatareaof 8'x 8'willbe requiredto assembleandproperlyusethe PROSPOTlrtersrMPC-1000.

. Youwillneedthefollowingtoolsanda helperto completethe assembly:

. 5 mm AllenWrench

. 14 mm BoxEndWrench

. 17 mm BoxEndWrench

. 19 mm BoxEndWrench

. FloorPadding,suchas cardboard,to avoidscratchingyourfloorduringassembly.

. A goodpairof scissorswillbe helpfulin separatingthe partsfromoneanotherwhileremovingthemfromthe caTtons.

o HANDTIGHTENall bolts.DO NOTfullytightenboltsuntilinstructedto do so.

. Beforeassembly,separateand identifythe righfsidedpartsfromthe left-sidedparts.Thesepartsare easily distinguishedby the mannerin whichthe pre-drilledholesalignwithcorrespondingparts.or are identifiedby " L " & " R " s t i c k e r s .

. The PROSPO"ffitnessrMPC-1000usesseveraldifferentlengthsof bolts.Be carefulto use the correctlength of boltcalledfor at eachstepof assemblyRefer.to the sizingchartsprovided.

rWARNING: Never perform any maintenance on the PROSPOT/itnesslM PC-l000while the PowerSupply is pluggedinto the wall !!!

STEP# 1: MAINFRAMEASSEMBLY

1.Placethe two BaseRails(1 & 2) oppositeeach otherin the centerof the assemblyarea as shownin the lllustrationPlace.the LowerCrossBrace(3) betweenthe two BaseRails(1 & 2) so thatthe sidepre-drilled holesof the BaseRails(1 & 2) alignwiththe endholesof the LowerCrossBrace(3).

2.Carefullythreadthe CrossBraceWire Harness(8) throughthe correspondingside pre-drilledholesof the BaseRails(1 & 2) thenpulltheWire Harness(8)outof thetop holesof the BaseRails('l& 2).

3.Attachthe two BaseRails(1 & 2) to the LowerCrossBrace(3) usingtwo UprightSupportPlates(6),four bolts(22),eightwashers(18)andfournuts(20)as shown.HANDTIGHTENthe boltsat thistime.

4.Attachthe RightUprightGuidepostAssembly(7, 10,23\ to the LowerCross Brace(3) and the Upright SupportPlate(6) attachedon the rightbaserail(1) usingtwo bolts(22),fourwashers( 18)andtwo nuts(20) as shown.HANDTIGHTENthe boltsat thistime.

5.Attachthe Left UprightGuidepostAssembly(9, 12,23) to the LowerCross Brace (3) and the Upright SupportPlate(6) attachedon the leftbaserail(2) usingtwo bolts(22),fourwashers( 18)andtwo nuts(20) as shown.HANDTIGHTENthe boltsat thistime.

6.Plugtogetherbothof the CrossRailWire Harness(8)to lowerendsof the SpiralSignalCables(46)Iocated just underthe perforatedSliderShieldson backof the ScreenPanels(23).

_ _ 1 _ _

Image 3
Contents OwnersManual RMModetPc-tooo Pno$PoWnessTable of Contents STEP# 1 Mainframeassembly STEP#2 Sensorweightbar Installation UprightGuidepostAssemblyDiagram AssemblyDrawingof PROSPOTfitnessrMPC-1000 9ff@ Following Rules should be Carfully Followed Page Maintenanceof ProSpotJitnessruProduct MaintenanceProgramPnoSrorlrze.ss,Inc Warrantv InformationAssy# I Description RMModelPC-1000PartsList PROSPOTfirnessHOW to Usespotblocks ProSpot,Inc. EquipmentLimited Warranty SB7-e-04