1. Mark middle and bottom pole sections indicated distance from ends with tape.
MIDDLE
TOP
5" (12.7 cm)
BOTTOM 14" (35.6 cm)
1
1
1
2. Ensure ground is level with playing surface, then dig pole hole*.
WARNING!
CONTACT UTILITIES
BEFORE DIGGING.
GROUND SURFACE
•Surface du sol
•Superficie del piso
•Superficie al suolo
•Solo
•Bodenfläche
•Grondoppervlak
•Grundflade
•Underlag
•Markyta
NOTE: Maximum distance from edge of hole to edge of playing surface 6” (15.2cm).
18" (42.7 cm)
6" (15.2 cm)
24" (61 cm)
WARNING!
PLAYING SURFACE
•Surface de jeu
•Superficie de juego
•Superficie di giuoco
•Área de Jogo
•Spielfläche
•Speeloppervlak
•Spilleflade
•Spillebane
•Spelplan
*This hole size represents the minimum requirement for ideal conditions. The location (hill/incline) of the pole, soil conditions (sand/clay) and other factors could require a larger hole size and concrete footing.
8" (20.3 cm)
14" (35.6 cm)
3. Pour concrete into hole and insert bottom pole section to the 14” (35.6 cm) mark. Center pole section in hole, and level in all directions. Check leveling several times while concrete is curing. NOTE: Minimum distance from center of pole to edge of hole 8” (20.3 cm).
Tamp down concrete to release air pockets, then
4. build drainage hill. NOTE: Bottom of pole to top of hole/playing surface, not including drainage hill 14” (35.6 cm).
Fill pole half way with concrete.
5. NOTE: Approximately 500 lb (227 kg) of concrete is required for hole and bottom pole section.
P/N 205331C 10/01 | 16 |