Weider WESY19740 user manual Arm Assembly

Page 9

8.

Attach the Shroud (17) to the Top Frame (4) with

8

 

 

 

 

two M6 x 16mm Screws (62) and two M6

 

4

 

 

 

 

 

 

Washers (82).

 

 

 

 

 

 

 

 

 

 

82

 

 

 

 

Attach the Shroud (17) to the brackets on the

62

 

 

 

 

Stabilizer (2) with two M6 x 16mm Screws (62)

 

 

 

 

 

 

 

 

 

and two M6 Washers (82). Make sure the brack-

 

 

17

 

 

ets are inside the Shroud.

62

82

 

 

 

 

 

 

Tighten the Nylon Locknuts (56, 58) used in

 

 

 

 

 

steps 2–7.

 

 

 

 

 

 

62

 

 

 

 

 

82

 

 

 

 

 

 

 

 

Bracket

 

 

 

 

82

2

 

 

 

 

62

 

 

 

 

 

 

Arm Assembly

9

 

 

 

 

 

56

7

 

 

 

 

 

9.

Grease the M10 x 77mm Bolt (79). Orient the Leg

 

 

Grease

 

Lever (8) with the welded support as shown.

 

 

 

 

8

 

 

 

Attach the Leg Lever to the Front Leg (7) with the

 

 

 

 

 

 

 

 

 

Bolt and an M10 Nylon Locknut (56). Do not

 

 

79

 

 

overtighten the Locknut; the Leg Lever must

 

 

 

 

 

be able to pivot easily.

Welded

 

 

 

 

 

Support

 

 

 

10.

Grease the M10 x 77mm Bolt (79). Attach the

10

 

4

 

 

Pivot Frame (5) to the Top Frame (4) with the Bolt

 

 

 

 

 

 

 

and an M10 Nylon Locknut (56). Do not over-

 

 

 

 

 

tighten the Locknut; the Pivot Frame must be

 

 

 

 

 

able to pivot easily.

 

56

79

 

 

Attach the two Arm Pins (40) to the Pivot Frame

69

5

Holes

 

 

 

 

 

 

 

Grease

 

 

(5) with two M4 x 20mm Self-tapping Screws

 

 

 

 

 

 

 

 

(69). Insert the Arm Pins into the two holes in the

 

 

3

 

 

Upright (3).

40

 

 

 

 

69

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40

 

 

 

9

 

 

 

Image 9
Contents QUESTIONS? Model No. WESY19740 Serial NoCustomer HOT Line Table of Contents Important Precautions Before YOU Begin Left SideRight Side Make Assembly Easier for Yourself AssemblyLocknuts yet Frame AssemblyLocknut yet Bumper is pointing upTube is oriented as shown Locknuts yet Arm Assembly Assemble the Left Arm 10 in the same manner Cable AssemblyPage Locate the Low Cable 53. Route the Cable Sure the Finger Guards are on the outside Bracket as shown Page Seat Assembly Page Changing the Weight Setting AdjustmentsAttaching the Accessories to a Pulley Station Using the Lock LeverUsing the Curl PAD Locking the Weight StackARM Conversion Weight Resistance Chart Weight High Butterfly Press ARM LEG Lever LOW PulleyLbs High Cable Cable DiagramsArm Cable Low CableTightening the Cables MaintenanceExercise Guidelines Muscle Chart Cooling DownStaying Motivated Part Identification Chart Qty Description Part LIST-Model No. WESY19740Exploded DRAWING-Model No. WESY19740 41 57 Ordering Replacement Parts Limited WarrantyIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT