Weider WESY19740 user manual Cable Assembly, Assemble the Left Arm 10 in the same manner

Page 10

11.Grease an M10 x 51mm Bolt (66). Attach a Cable Pivot (39) to the Right Arm (9) with the Bolt and an M10 Nylon Locknut (56). Do not overtighten the Locknut; the Cable Pivot must be able to pivot easily.

Wet the inside of a Large Foam Pad (42) with soapy water. Slide the Large Foam Pad onto the Right Arm (9).

Attach the lower end of a Handle (11) to the Right Arm (9) with an M10 x 45mm Button Bolt (77) and an M10 Large Washers (80). Press a 50mm Round Handle Cap (31) into the Right Arm. Do not tighten the Bolt yet.

Attach the upper end of the Handle (11) to the Right Arm (9) with an M10 x 67mm Button Bolt (71), two M10 Washers (57), two 12mm Spacers (52), and an M10 Nylon Locknut (56). Tighten the M10 x 45mm Button Bolt (77).

Assemble the Left Arm (10) in the same manner.

12.Grease an M10 x 85mm Bolt (67) and two Arm Bushings (44). Attach the Right Arm (9) to the Pivot Frame (5) with the Bolt, two M10 Washers (57), the two Arm Bushings, and an M10 Nylon Locknut (56). Do not overtighten the Locknut; the Arm must be able to pivot easily.

Attach the Left Arm (10) to the Pivot Frame (5) in the same manner.

Cable Assembly

13.Refer to the CABLE DIAGRAMS on page 20 as you assemble the cables and to identify the cables.

Locate the Arm Cable (54). Grease an M8 x 22mm Shoulder Bolt (65). Attach the Cable to the indicated Cable Pivot (39) with the Bolt and an M8 Nylon Locknut (58).

11

57 56

66

Grease

 

 

52

 

 

 

9

 

39

52

 

 

 

57

 

 

 

71

 

56

10

 

11

 

 

42

 

 

 

31

80

 

 

 

 

 

77

 

 

12

 

 

 

 

67

 

 

 

Grease

 

 

 

57

 

5

 

 

 

9

44

 

 

 

44

 

 

 

56

57

 

 

 

 

Grease

 

10

13

 

 

 

 

 

58

 

 

 

39

 

 

 

54

 

 

 

Grease

 

 

 

65

10

Image 10
Contents Model No. WESY19740 Serial No QUESTIONS?Customer HOT Line Table of Contents Important Precautions Left Side Before YOU BeginRight Side Assembly Make Assembly Easier for YourselfFrame Assembly Locknuts yetBumper is pointing up Locknut yetTube is oriented as shown Locknuts yet Arm Assembly Cable Assembly Assemble the Left Arm 10 in the same mannerPage Locate the Low Cable 53. Route the Cable Sure the Finger Guards are on the outside Bracket as shown Page Seat Assembly Page Attaching the Accessories to a Pulley Station AdjustmentsChanging the Weight Setting Using the Lock LeverLocking the Weight Stack Using the Curl PADARM Conversion Weight High Butterfly Press ARM LEG Lever LOW Pulley Weight Resistance ChartLbs Arm Cable Cable DiagramsHigh Cable Low CableMaintenance Tightening the CablesExercise Guidelines Cooling Down Muscle ChartStaying Motivated Part Identification Chart Part LIST-Model No. WESY19740 Qty DescriptionExploded DRAWING-Model No. WESY19740 41 57 Limited Warranty Ordering Replacement PartsIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT