4.Attach the Frame (9) to the Upright (2) with two M8 x 80mm Bolts (100), two M8 Washers (103), and two M8 Nylon Locknuts (78). Do not tighten the Nylon Locknuts yet.
Attach the Frame (9) to the Front Leg (10) with two M8 x 65mm Bolts (101), two M8 Washers (103), and two M8 Nylon Locknuts (78). Do not tighten the Nylon Locknuts yet.
5.Attach the Top Frame (4) to the Upright (2) with two M8 x 80mm Bolts (100), two M8 Washers (103), and two M8 Nylon Locknuts (78). Do not tighten the Nylon Locknuts yet.
6.Attach the Left Shroud (21) to the Top Frame (4) with two M4 x 12mm
See drawing 6A. Attach the bottom of the Left Shroud (21) to the Base (1) with two M4 x 12mm
Repeat this step for the Right Shroud (22).
4 |
| 78 | 2 |
|
| ||
|
| 9 | 100 |
|
| 78 | |
|
| 103 | |
|
| 78 |
|
|
| 78 | 100 |
|
|
| |
|
|
| 103 |
| 103 | 10 |
|
|
|
| |
| 101 |
|
|
5 |
|
|
|
|
| 100 |
|
|
| 103 |
|
|
| 103 |
|
|
| 4 |
|
|
| 78 |
|
|
| 78 |
|
|
| 2 |
|
6 | 22 | 6A |
|
|
|
| |
4 |
|
|
|
102 |
|
|
|
21 |
|
|
|
|
|
| 1 |
|
| 102 | 21 |
|
|
|
10