16. Locate the Crossbow Fulcrum (18) on the Lat | 16 |
| 86 |
|
|
|
Tower (4) (see the inset drawing). Slide the |
|
|
|
| ||
|
|
|
|
| ||
|
|
|
| Edges | ||
Crossbow Spacer (35) onto the rods on the |
| 72 |
|
| ||
Crossbow Fulcrum. Make sure the Spacer is |
|
|
| up |
| |
|
|
|
|
| ||
|
|
|
|
|
| |
oriented as shown in the drawing. |
|
|
|
|
|
|
Set the Crossbows into the Crossbow Spacer (35) |
|
|
|
|
| 96 |
in the following order: the |
|
|
|
|
| |
|
|
|
|
|
| |
Crossbow (67), the | Rings on |
|
|
|
|
|
Crossbow (36), an | this side |
|
|
|
| 44 |
|
|
|
|
| ||
Crossbow (95), and the | 4 | 35 |
|
|
| 95 |
Make sure the indicated rings are on the side |
|
|
|
| 95 | |
|
|
|
|
| ||
shown and the arrows point toward the Spacer. |
| 18 |
|
| 67 | 36 |
| 18 |
|
|
| ||
Attach the Crossbow Cover Plate (72), with the |
| Rods |
|
| ||
|
|
|
|
|
| |
edges up, to the Crossbow Spacer (35) with two | 17 |
|
|
|
|
|
M8 x 19mm Button Head Screws (86). |
|
|
|
|
| |
|
|
|
|
|
| |
17. Locate the Long Cable (80). Insert one end of |
|
|
|
| 80 | 71 |
the Cable through the welded tube on the indicat- |
|
|
|
|
| |
|
|
|
| 11 |
| |
ed end of the Cross Tube (11) and then through a |
|
|
|
| 104 | |
|
|
|
|
| ||
Swivel Arm (22). If necessary, use the tip of a |
|
|
|
|
| |
|
|
|
|
|
| |
screwdriver to pull the end of the Cable out of the |
|
|
|
|
| 22 |
Swivel Arm. Be sure the Cable is on the indicat- |
|
| 28 |
|
| |
|
|
|
|
| ||
ed side of the welded rod in the Swivel Arm. |
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| Rod |
Insert the Swivel Arm (22) into the welded tube |
|
|
|
|
| 76 |
on the Cross Tube (11). Secure the Swivel Arm |
|
|
|
|
| |
|
|
|
|
|
| |
with an M4 x 5mm Screw (104). |
|
|
|
|
|
|
Wrap the Long Cable (80) around a 90mm Pulley |
|
|
|
|
|
|
(28). Attach the Pulley inside of the Swivel Arm | 18 |
|
|
|
|
|
(22) with an M10 x 42mm Button Head Bolt (71) |
| Flat |
|
|
| |
|
|
|
|
| ||
and an M10 Nylon Locknut (76). |
|
| Edge | 29 | 76 | |
|
|
|
|
| ||
18. Wrap the Long Cable (80) around a 90mm Pulley |
|
|
|
|
|
|
(28). Attach the Pulley and a Pulley Guard (29) to |
| 73 |
|
|
| 80 |
the indicated M10 x 140mm Carriage Bolt (73) |
|
|
|
| 28 | |
with an M10 Nylon Locknut (76). Be sure the flat |
|
|
|
|
| |
edge of the Pulley Guard is on the side shown. |
|
|
|
|
|
|
19. Attach a Pulley Housing (94) to the indicated “U”- | 19 |
|
|
|
|
|
channel on the |
|
|
|
|
| |
|
|
|
|
|
| |
with an M10 x 102mm Bolt (24), two Pivot |
|
|
|
|
|
|
Bushings (74), and an M10 Nylon Locknut (76). |
|
|
|
|
|
|
Wrap the Long Cable (80) around a 90mm Pulley |
| 44 |
|
|
|
|
(28). Attach the Pulley inside of the Pulley |
|
|
|
|
| |
| 76 |
|
|
|
| |
Housing (94) with an M10 x 42mm Button Head |
|
|
|
|
| |
|
|
|
| |||
Bolt (71) and an M10 Nylon Locknut (76). |
| 74 |
|
| ||
|
|
|
|
| ||
|
|
|
| 76 |
| |
|
| 71 |
|
|
| |
|
|
| 94 |
| ||
|
|
|
|
| ||
|
| 28 | 74 |
|
|
|
|
|
|
|
|
| |
|
| 80 |
| 24 |
| |
|
|
|
|
|
| |
| 10 |
|
|
|
|
|