Weider WESY59930 user manual Arm 22. Be sure the Cable is on the indicated

Page 11

20. Wrap the Long Cable (80) under a 90mm Pulley

20

 

 

 

(28) as shown. Attach the Pulley and a Pulley

 

 

 

 

 

 

 

Guard (29) to the Upright (3) with an M10 x

 

 

 

 

113mm Button Head Bolt (40) and an M10 Nylon

 

3

 

 

Locknut (76). Be sure the flat edge of the

 

 

28

 

 

 

Pulley Guard is on the bottom.

 

 

 

 

 

 

 

 

40

 

 

76

 

 

 

 

 

 

 

 

29

 

 

 

 

80

 

 

 

 

Flat

 

 

 

 

Edge

21. Attach a Pulley Housing (94) to the indicated “U”-

21

 

 

 

channel on the 10-pound Center Crossbow (44)

 

 

 

 

 

 

 

with an M10 x 102mm Bolt (24), two Pivot

 

 

 

 

Bushings (74), and an M10 Nylon Locknut (76).

 

44

 

 

Wrap the Long Cable (80) around a 90mm Pulley

 

74

 

74

(28). Attach the Pulley inside of the Pulley

 

94

 

76

Housing (94) with an M10 x 42mm Button Head

24

 

76

Bolt (71) and an M10 Nylon Locknut (76).

 

 

 

 

 

 

 

71

 

 

 

 

 

 

28

 

 

 

 

80

22. Wrap the Long Cable (80) around a 90mm Pulley

22

 

 

 

(28). Attach the Pulley and a Pulley Guard (29) to

 

 

 

28

 

 

the indicated M10 x 140mm Carriage Bolt (73)

 

29

 

 

 

with an M10 Nylon Locknut (76). Be sure the flat

 

 

 

 

 

 

 

edge of the Pulley Guard is on the side

 

 

 

 

shown.

80

 

 

76

 

 

 

 

 

 

 

 

 

Flat

 

23. Make sure there are no Crossbows (not shown)

 

Edge

 

 

 

 

 

under the “U”-channels on the 10-pound Center

 

 

 

73

Crossbow (not shown). Have a second person

 

 

 

pull on the Long Cable (80) to create slack in the

 

 

 

 

Cable.

23

 

 

 

Insert the end of the Long Cable (80) through the

 

 

 

 

welded tube on the indicated end of the Cross

 

 

 

 

Tube (11) and then through the remaining Swivel

 

 

22

71

Arm (22). Be sure the Cable is on the indicated

 

Rod

104

side of the welded rod in the Swivel Arm.

 

 

 

80

 

 

 

 

 

 

 

Insert the Swivel Arm (22) into the welded tube

 

 

 

11

on the Cross Tube (11). Secure the Swivel Arm

 

28

76

 

 

with an M4 x 5mm Screw (104).

 

 

 

 

 

 

 

Wrap the Long Cable (80) around a 90mm Pulley

 

 

 

 

(28). Attach the Pulley inside of the Swivel Arm

 

 

 

 

(22) with an M10 x 42mm Button Head Bolt (71)

 

 

 

 

and an M10 Nylon Locknut (76).

 

 

 

 

 

11

 

 

 

Image 11
Contents Customer HOT Line QUESTIONS?Model No. WESY59930 Serial No Table of Contents Important Precautions Before YOU Begin DimensionsMake Things Easier for Yourself AssemblyPage Locknut the Leg Lever must be able to pivot easily Locknuts the Eyebolts must be able to rotate freelyKnob is aligned with the slot in the Seat Carriage, as shown Page Edge of the Pulley Guard is on the side shown Make sure the indicated rings are on the sideLocate the Long Cable 80. Insert one end Side of the welded rod in the Swivel Arm Arm 22. Be sure the Cable is on the indicatedOnto the hook welded to the bottom of the Bench Rail Attaching the High Pulleys and LEG Lever AdjustmentsAdjusting the Seat Adjusting the Resistance Attaching the AccessoriesStoring the Resistance System Adjusting the BackrestLong Cable Cable DiagramUsing the Removable Crossbows Exercise Guidelines Staying Motivated Muscle ChartCooling Down Thursday Aerobic Exercise Date DateExercise Resistance Sets Reps Aerobic ExerciseIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT Ordering Replacement PartsLimited Warranty Part Identification Chart Page Qty Description Part LIST-Model No. WESY59930Exploded DRAWING-Model No. WESY59930