9.Attach the Right Squat Weight Rest (12) and the Left Squat Weight Rest (11) to the Uprights (3) as shown.
Make sure that both Squat Weight Rests (11, 12) are at the same height.
10.Attach the Curl Pad (17) to the Curl Post (4) with four M6 x 20mm Screws (31). Start all four
Screws, and then tighten them.
9 |
3 |
11 |
3 |
12 |
10 |
17 |
31 |
31 |
4 |
11.Make sure that all parts are properly tightened before the weight bench is used. Note: Extra parts may be included. The use of all remaining parts will be explained in ADJUSTMENT, beginning on page 11.
10