Express® Deck Lavatory System |
|
| Installation Instructions |
Installation Instructions
Supplies required for installation:
•(6) 3/8" wall anchors, bolts and 1" min. O.D. washers to mount main frame and bowl to wall (minimum
•STD. HEIGHT ONLY: (2) 3/8" wall anchors, bolts and 1" min. O.D. washers to mount scuff base to wall
•1/2" NPT hot and cold supply piping
•
•110 volt electrical outlet for optional 110/24 VAC
•(2) #10 wall anchors and fasteners for optional Vernatherm™ valve mounting
•
Step 1: Rough in
IMPORTANT: Dimensions shown in Figure 1 on page 5 are for a Standard and Wall- Hung Pedestal Express® Deck only. Make sure to follow appropriate dimensions based on configuration and required rim height. See Charts 1 and 2 on page 5 before beginning
1.Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.
2.Rough in
3.FOR OPTIONAL ELECTRIC FAUCETS: Install the 110 volt GFCI electrical outlet per local code at the location shown in Figure 1.
4.Install four to six 3/8" wall anchors with a minimum
5.On the back of the bowl, measure the distance between the 3/4" bowl mounting holes. Divide this measurement in half. Measure and mark this dimension on the wall to the left of the centerline and to the right of the centerline. Install two 3/8" wall anchors with a minimum pull- out rating of 1,000 lbs. (supplied by installer) at the locations marked (ref. location “A” shown in Figure 1).
NOTE: Wall anchors at location “C” (standard frame only) do not require a minimum
NOTE: The anchors will be used to mount the Express® Deck bowl and frame to the wall.
4 | 2/9/07 | Bradley Corporation • |