Buhler 2895E manual Cable Sleeve Jam Nut Lock Washer Screw

Page 29

bühler

Allied Front-End Loader

On valves fitted with joystick cables loosen off jam nut and cable sleeves to gain access to the valve spool. Clean all debris and any existing corrosion. Spray areas with a light corrosion resistant lubricant. Re-mount cables sleeves and adjust so that joystick is centered in both axis to the base. Lock cable sleeve by using the jam nut. Note: In severe cold weather climates, inspect and maintain the valve and joystick cables before cold weather.

Cable Sleeve

Jam Nut

Cable

Lock

Washer Screw

- 27 -

P4493

Image 29
Contents Page Warranty Labor Warranty Claims2895E OPERATOR’S and Parts Manual BühlerIllustration TSL shown Loader SpecificationsREG TSL Specification ChartIntroduction Serial Number here General Safety Notes SafetyBühler Allied Front-End Loader Safety Decal Location Electrocution Hazard PRE Operation Operation Bucket Backfilling or Scraping Bühler Handling bales and pallets Level indicator Grapple Installing Installing / Removing LoaderRemoving Bühler Installing / Removing Loader Attachments TSL Loader Shown LubricationGeneral Inspection MaintenanceMounting Kit Bolt Torque ChartHydraulics Bühler Cable Sleeve Jam Nut Lock Washer Screw TSL General Note and Instructions Problem Trouble ShootingPossible Cause RemedyTrouble Shooting Problem Possible Cause Remedy 2895E Regular and True Self Leveling 2895E & 2895E S Parts Appendix2895E & 2895E S Main Frame Assembly Item Part No Description 2895E 2895E S 2895E & 2895E S Hydraulic Plumbing Assembly Bühler 2895E TSL & 2895E S TSL Main Frame Assembly Description 2895E TSL 2895E S TSL 895E TSL & 2895E S TSL Main Frame Assembly2895E TSL & 2895E S TSL Hydraulic Plumbing Assembly Item Part No Description 2895E 2895E S Possible Attachment Interference 2895E TSL & 2895E S TSL TSL 2895E Cylinder AssemblyHydraulic Fitting Torques Page Buhler Manufacturing a partnership