Gas and Steam Models Only

120-240V Application with Neutral

200-240V Application without Neutral

Caution

!The dryer must be grounded. A ground lug has been provided for this purpose.

Input connection wiring must be sized properly to handle the dryer’s current draw. This information is printed on the dryer’s data label.

Important

!A strain relief must be used where the input wiring enters the oven assembly.

Electrically Heated Models Only

The electrical input connections are made at the rear service box located at the right upper section of the dryer. The ground connection is made to a copper lug also provided in this area. To gain access, remove rear service cover.

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and sometimes neutral) and ground. Single-phase (1ø) power for the control circuit and for any single-phase (1ø) motors (if present) is done internally to the dryer by the factory at the oven contactor. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

The neutral will only be used on 4-wire service. This is typical for 380-416V, 50 Hz.

Caution

!The dryer must be grounded. A ground lug has been provided for this purpose.

Input connection wiring must be sized properly to handle the dryer’s current draw. This information is printed on the dryer’s data label.

Electric Models Only

Single-Phase (1ø) Wiring Connections/Hookup

Two Element Configuration

Three Element Configuration

3-Phase (3ø) Wiring Connections/Hookup

20

JLA Limited

113429 - 9

Image 20
Contents T20 / T30 / T50 / T75 Installation/Operator Manual JLA LimitedRetain This Manual in a Safe Place for Future Reference Table of Contents Safety Precautions What To Do If You Smell GasCE only T20 Specifications 33.02 cmT20 Specifications T30 Specifications 37.78 cmT30 Specifications T50 Specifications 40.64 cmT50 Specifications T75 Specifications T75 Specifications Installation Procedures Unpacking/Setting UpLocation Requirements Dryer Enclosure RequirementsDomestic Type I T20, T30, T50 Only Fresh Air Supply RequirementsExhaust Requirements Outside Ductwork Protection Single Dryer VentingHorizontal Venting Vertical VentingElectrical Information Electrical RequirementsElectrical Service Specifications Gas Models Only T20T30 T50Single-Phase 1ø Wiring Connections/Hookup Electric Models OnlyGrounding Electrical ConnectionsTwo Element Configuration Three Element Configuration Electrically Heated Models OnlyGas Information CE DryersDMS T20 T50 Piping/ConnectionsConverting from One Family Gas to Another Conversion from Propane or Butane Gas to Natural Gas Gas Pressure AdjustmentRegulated Gas Valve Gas Pressure Testing Gas Pressure Test ProcedureSteam Information Steam Coil pH LevelWater Information Preparation for Operation/Start-Up Preoperational TestService/Parts Information Warranty InformationPreoperational Instructions Coin ModelsRoutine Maintenance Data Label Information Standard Label CE Label07/15/08