American Dryer Corp ID-120 installation manual

Page 34

6.Steam Damper Air Piston (Flow Control) Operation Adjustment

Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bars), steam damper operation must be checked before the dryer is put into operation. Refer to page 33 for instructions to check steam damper operation. If steam damper adjustment is necessary, locate the flow control valve and make the necessary adjustments as noted below.

30

Image 34
Contents ID-120 Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification Specifications GAS and SteamSpecifications IDG-120 Gas IDS-120 Steam Component Identification Dryer Rear View Illus. No Installation Procedures Location RequirementsUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationPage Ducting Horizontal and Vertical Page Page Electrical Information Electrical RequirementsID-120 Gas and Steam Only Electrical Connections GAS Information Type of GAS Page Page Steam Information Bars. Refer to Steam DamperAir System Connections, item 4Page COM Pressed AIR Pressure AIR Supply Page Compressed AIR Preparation for OPERATION/START-UPPreoperational Tests Page Basket Tumbler Coating Operating Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSteam Dryers Adjustments LubricationReversing Timer SPIN/DWELLADJUSTMENTS SectionviiProcedure for Functional Check Replacement Components Page Datalabel Information Data LabelSerial Number For Phase 7 Models P O R T a N TFor Dual Timer Models ADC113330 1 08/31/01-25