American Dryer Corp ID-120 installation manual Electrical Connections

Page 26

3.Electrical Connections

NOTE: A wire diagram is located in the front electrical control box for connection data.

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, and L3), GROUND, and in the case of 4 wire service, the neutral. Providing local codes permit, power connections to the dryer can be made by the use of flexible underwriters laboratory listed cord or pigtail (wire size must conform to rating of the dryer), or the dryer can be hard wired directly to the service breaker. In ALL cases, a strain relief must be used where the wires enter the dryer electrical service (relay) box.

4. Grounding

A ground (earth) connection must be provided and installed in accordance with state and local codes. In the absence of these codes, grounding must conform to applicable requirements of the National Electrical Code ANSI/NFPA NO. 70- LATEST EDITION, or in Canada, the installation must conform to applicable Canada Standards: Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or LATEST EDITION. The ground connection may be to a proven earth ground at the location service panel.

NOTE: Agrounding connection (terminal lug) is provided in the dryer’s electrical service box at rear.

For added personal safety, when possible, it is suggested that a separate ground wire (sized per local code) be connected from the ground connection of the dryer to a grounded cold water pipe. DO NOT ground to a gas pipe or hot water pipe. The grounded cold water pipe must have metal to metal connection ALL the way to the electrical ground. If there are any nonmetallic interruptions, such as, a meter, pump, plastic, rubber, or other insulating connectors, they must be jumped out with no. 4 copper wire and securely clamped to bare metal at both ends.

IMPORTANT: For personal safety and proper operation, the dryer must be grounded. For proper operation of the microprocessor controller (computer), an earth (zero) ground is required.

NOTE: Grounding via metallic electrical conduit (pipe) is not recommended.

These electrical connections are made at the terminal block located in the electric service box at the rear, upper right hand corner of the dryer. To gain access into this service box, the service cover must be removed.

NOTE: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED.

22

Image 26
Contents ID-120 Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification Specifications GAS and SteamSpecifications IDG-120 Gas IDS-120 Steam Component Identification Dryer Rear View Illus. No Installation Procedures Location RequirementsUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationPage Ducting Horizontal and Vertical Page Page Electrical Information Electrical RequirementsID-120 Gas and Steam Only Electrical Connections GAS Information Type of GAS Page Page Steam Information Bars. Refer to Steam DamperAir System Connections, item 4Page COM Pressed AIR Pressure AIR Supply Page Compressed AIR Preparation for OPERATION/START-UPPreoperational Tests Page Basket Tumbler Coating Operating Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSteam Dryers Adjustments LubricationReversing Timer SPIN/DWELLADJUSTMENTS SectionviiProcedure for Functional Check Replacement Components Page Datalabel Information Data LabelSerial Number For Phase 7 Models P O R T a N TFor Dual Timer Models ADC113330 1 08/31/01-25