Woods Equipment BW15LH manual 40Assembly, Install Chain or Belt Shielding

Models: BW15LH

1 72
Download 72 pages 40.22 Kb
Page 40
Image 40
Install Chain or Belt Shielding

Install Chain or Belt Shielding

Full chain shielding must be installed when operating in populated areas or other areas where thrown objects could injure people or damage property.

If this machine is not equipped with full chain shielding, operation must be stopped when any- one comes within 300 feet (92 m).

This shielding is designed to reduce the risk of thrown objects. The mower deck and protec-

tive devices cannot prevent all objects from escaping the blade enclosure in every mowing condition. It is possible for objects to ricochet and escape, traveling as much as 300 feet (92 m).

Install chain and rubber shields with hardware as shown. (Refer to Figure 33 for Chain Shielding Installa- tion; Figure 35 and Figure 36 for Belt Shielding Installa- tion.)

NOTE: Chain Shielding: Install four (two per wing) 4- link chain sections (16) to the wing skid shoes. Secure with carriage bolts (19) and flange lock nuts (21).

1.Front Center Chain Plate

2.Front Right Chain Plate

3.Front Left Chain Plate

4.Rear Chain Plate, Inner

5.Rear Chain Plate, Outer

10. Pin, 9 to 11 Chains

11.Pin, 13 to 15 Chains

13.Pin, 19 to 21 Chains

14.Pin, 22 to 24 Chains

16.5/16 Chain - 4 Link

17.5/16 Chain - 5 Link

18.5/16 Chain - 11 Link

20.3/8 NC x 2 HHCS

22.3/8 NC x 1 Carriage Bolt GR5

23.3/8 NC Flanged Lock Nut

Figure 33. Chain Shielding Installation - Center Section

40Assembly

(Rev. 3/3/2010) MAN0810 (9/24/2009)

Page 40
Image 40
Woods Equipment BW15LH manual 40Assembly, Install Chain or Belt Shielding