American Dryer Corp D-40 installation manual

Page 45

2.Each part must be tagged with the following information:

a.Model number and serial number of the dryer from which part was removed.

b.Nature of failure (be specific).

c.Date of dryer installation.

d.Date of part failure.

e.Specify whether the part(s) being returned is for a replacement, a credit, or a refund.

NOTE: If a part is marked for a credit or a refund, the invoice number covering the purchase of the replacement part must be provided.

NOTE: Warranty tags (ADC Part No. 450064) are available at “no charge” from ADC upon request.

3.The company returning the part(s) must clearly note the complete company name and address on the outside of the package.

4.ALL returns must be properly packaged to insure that they are not damaged in transit. Damage claims are the responsibility of the shipper.

IMPORTANT: No replacements, credits, or refunds will be issued for merchandise damaged in transit.

5.ALL returns should be shipped to the ADC factory in such a manner that they are insured and a proof of delivery can be obtained by the sender.

6.Shipping charges are not the responsibility of ADC. ALL returns should be “prepaid” to the factory. Any “C.O.D.” or “COLLECT” returns will not be accepted.

IMPORTANT: No replacements, credits, or refunds will be issued if the claim cannot be processed due to insufficient information. The party filing the claim will be notified in writing, either by “FAX” or “CERTIFIED MAIL - Return Receipt Requested,” as to the information necessary to process claim. If reply is not received by the ADC Warranty Department within thirty (30) days from the FAX/letter date, then no replacements, credits, or refunds will be issued, and the merchandise will be discarded.

41

Image 45 Contents
Installation Manual Important Note to Purchaser Retain This Manual In a Safe Place For Future ReferenceFor Your Safety Page Table of Contents Section Routine Maintenance Receiving and Handling Important InformationExplosion could Result Safety PrecautionsStandards Specifications SpecificationsSpecifications UNPACKING/SETTING UP Installation ProceduresLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Vertical Venting Multiple Dryer Common Venting Illus. C Important Venting Reminders Electrical Requirements Electrical InformationMust be Provided SINGLE-PHASE 1Ø Electrical Connection Leads Important a Circuit Servicing Each Dryer Must be Provided Important a Circuit Servicing Each Dryer Must be Provided 40 GAS Steam GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Compressed AIR Pressure AIR Supply Page Steam Damper Air Piston Flow Control Operation Adjustment Preparation for OPERATION/START-UP GAS Models only Preoperational TestsCoin Models Preoperational InstructionsPage OPL Models Page SERVICE/PARTS Information ServiceParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Routine Maintenance CleaningSuggested Cleaning Schedule Lubrication AdjustmentsLint Drawer Removal Data Label Data Label InformationSerial Number TIM ING Legend Reversing Timer SPIN/DWELL AdjustmentsProcedure for Functional Check Replacement Components Page F.E. Fire Suppression System F.S.S S. In ActionBefore YOU Start Check Local Codes and Permits InstallationWater Connections Optional Manual Bypass Electrical Requirements System ResetParts Break Down Comp x 3/8 M.P.T. Brass Connector 822752 ADC 113370 1 03/25/02-25