American Dryer Corp ML-78II installation manual

Page 26

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and sometimes neutral) and ground. Single-phase (1ø) power for the control circuit is done internally to the dryer. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

For gas dryers manufactured for operation at 3-phase (3ø), the electrical connections are made at the power distribution block located in the service box at the rear, upper left corner of the dryer. The ground connection is made to the copper lug also provided in this box. To gain access to the service box contactor, the service box cover must be removed.

22

Image 26
Contents ML-78II Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications MLG-78II Gas Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Before Starting the DryerDryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Horizontal VentingPage Page Page Electrical Information Electrical RequirementsElectrical Service Specifications PER Dryer MLG-78II GasPage Black Page Page GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down InstructionsParts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationReversing Timer SPIN/DWELL Adjustments Timing LegendData Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components P O RTA N T