American Dryer Corp ML-78II installation manual

Page 30

3.Piping/Connections

ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and must be done by a qualified professional. It is important that gas pressure regulators meet applicable pressure requirements, and that gas meters be rated for the total amount of ALL the appliance BTUs being supplied.

The dryer is provided with a 3/4” N.P.T. inlet pipe connection located at the right side of the base of the dryer. The minimum pipe size (supply line) to the dryer is 3/4” N.P.T. For ease in servicing, the gas supply line of each dryer must have its own shutoff valve.

The size of the main gas supply line (header) will vary depending on the distance this line travels from the gas meter or, in the case of L.P. gas, the supply tank, other gas operated appliances on the same line, etc. Specific information regarding supply line size should be determined by the gas supplier.

NOTE: Undersized gas supply piping can create a low or inconsistent pressure, which will result in erratic operation of the burner ignition system.

26

Image 30
Contents ML-78II Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications MLG-78II Gas Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Before Starting the DryerDryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Horizontal VentingPage Page Page Electrical Information Electrical RequirementsElectrical Service Specifications PER Dryer MLG-78II GasPage Black Page Page GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down InstructionsSERVICE/PARTS Information ServiceParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSuggested Cleaning Schedule Adjustments LubricationReversing Timer SPIN/DWELL Adjustments Timing LegendData Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components P O RTA N T