American Dryer Corp ML-78II installation manual Preparation for OPERATION/START-UP

Page 32

H. PREPARATION FOR OPERATION/START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the left side panel/wall area behind the control door. In the case of 208 VAC or 240 VAC the supply voltage must match the electric service exactly.

3.Check to assure that the dryer is connected to the type of heat/gas indicated on the dryer data label.

4.The sail switch damper assembly was installed and pre-adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning.

5.Be sure that ALL gas shutoff valves are in the open position.

6.Be sure ALL back panels (guards) and electric box covers have been replaced.

7.Check ALL service doors to assure that they are closed and secured in place.

8.Be sure the lint drawer is securely in place.

9.Rotate the basket (tumbler/drum) by hand to be sure it moves freely.

10.Check bolts, nuts, screws, terminals, and fittings for security.

11.Check basket (tumbler) bearing setscrews to insure they are ALL tight.

28

Image 32
Contents ML-78II Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications MLG-78II Gas Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Before Starting the DryerDryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Horizontal VentingPage Page Page Electrical Information Electrical RequirementsElectrical Service Specifications PER Dryer MLG-78II GasPage Black Page Page GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down InstructionsParts SERVICE/PARTS InformationService Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationReversing Timer SPIN/DWELL Adjustments Timing LegendData Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components P O RTA N T