American Dryer Corp MLG31PCA installation manual Dryer Enclosure Requirements

Page 14

Even though a 12-inch (30.48 cm) clearance is acceptable, it is recommended that the rear of the dryer be positioned approximately 2 feet (0.61 meters) away from the nearest obstruction, i.e., wall, for ease of installation, maintenance, and service.

9.The dryer must be installed with a proper exhaust duct connection to the outside.

10.The dryer must be installed with provisions for adequate combustion and make-up air supply.

CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint build up.

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12-inches (30.48 cm) - (18-inches [45.72 cm] or more is recommended for ease of installation, maintenance, and service) - above the dryer’s outer top, except along the front of the dryer which may be closed in if desired.

NOTE: Even though a minimum of 12-inches (30.48 cm) above the dryer’s outer top is acceptable, a clearance of 18-inches (45.72 cm) or more is suggested for ease of installation and service (electrical power connections).

NOTE: When fire sprinkler systems are located above the dryers, a minimum of 12-inches (30.48 cm) above the dryer’s outer top is required.

NOTE: Allowances must be made for opening the control door.

Dryers may be positioned sidewall to sidewall. However, allowances must be made for opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about 2 feet (0.61 meters) away from the nearest obstruction for ease of installation, maintenance, and service (to be measured from the back guard). Refer to the illustration on the previous page for details.

NOTE: Air considerations are important for proper and efficient operation.

10

Image 14
Contents MLG31PCA Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage Specifications 71-1/2 Gas Location of the Dryer Installation ProceduresUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Page Electrical Information Electrical RequirementsLG31PCA GAS Information Type of GAS Typical GAS Connections Page Page Preparation for Operation Preoperational TestsPage Basket Tumbler Coating Shut Down Instructions Operating Instructions Starting the DryerPage Page Parts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationTroubleshooting SectionviiiFailed motor contactor/relay DMC computer L.E.D. display reads dSFL Failed keyboard touch pad label assembly Failed DMC computer If the dryer is equipped with optional battery back-up Dryer operates, but is taking too long to dry Condensation on main door glass Procedure for Functional Check Replacement Components Page Optional Gas Piping Kit Part No 1 02/11/02-20 05/01/02-250