The size of the main gas supply line (header) will vary depending on the distance this line travels from the gas meter (or in the case of liquid propane [L.P.] gas, the supply tank), the number of tees, other gas-operated appliances on the supply line, etc. Specific information regarding supply line size should be determined by the gas supplier.

NOTE: Undersized gas supply piping can create a low or inconsistent pressure, which will result in erratic operation of the burner ignition system.

Consistent gas pressure is essential at ALL gas connections. It is recommended that a 3/4” (19.05 mm) pipe loop be installed in the supply line servicing the bank of dryers. An in-line pressure regulator must be installed in the gas supply line (header) if (natural) gas line pressure exceeds 12.0 inches (29.9 mb) water column (W.C.) pressure. Refer to the illustration on page 25 for details.

IMPORTANT: Water column pressure of 3.5 inches (8.7 mb) for natural gas dryers and 10.5 inches (26.1 mb) for L.P. gas is required at the gas valve pressure tap of each dryer for proper and safe operation.

A 1/8” N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas supply line immediately upstream of each dryer.

IMPORTANT: Pipe joint compounds that resist the action of natural gas and L.P. gas must be used.

WARNING: Test ALL connections for leaks by brushing on a soapy water solution (liquid detergent also works well). NEVER TEST FOR GAS LEAKS WITH AN OPEN FLAME!!!

24

Image 28
Contents MLG31PCA Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage Specifications 71-1/2Gas UNPACKING/SETTING UP Installation ProceduresLocation of the Dryer Page Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Page Electrical Information Electrical RequirementsLG31PCA GAS Information Type of GAS Typical GAS Connections Page Page Preparation for Operation Preoperational TestsPage Basket Tumbler Coating Shut Down Instructions Operating Instructions Starting the DryerPage Page Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Cleaning Routine MaintenanceSuggested Cleaning Schedule Adjustments LubricationTroubleshooting SectionviiiFailed motor contactor/relay DMC computer L.E.D. display reads dSFL Failed keyboard touch pad label assembly Failed DMC computer If the dryer is equipped with optional battery back-up Dryer operates, but is taking too long to dry Condensation on main door glass Procedure for Functional Check Replacement Components Page Optional Gas Piping Kit Part No 1 02/11/02-20 05/01/02-250