Amana W10150613B, W10150612B Venting Requirements, If using an existing vent system

Page 11

Venting Requirements

WARNING

Fire Hazard

Use a heavy metal vent. Do not use a plastic vent. Do not use a metal foil vent.

Failure to follow these instructions can result in death or fire.

WARNING: To reduce the risk of fire, this dryer MUST BE EXHAUSTED OUTDOORS.

IMPORTANT: Observe all governing codes and ordinances.

The dryer exhaust must not be connected into any gas vent, chimney, wall, ceiling, attic, crawlspace, or a concealed space of a building.

If using an existing vent system

Clean lint from the entire length of the system and make sure exhaust hood is not plugged with lint.

Replace any plastic or metal foil vent with rigid or flexible heavy metal vent.

Review Vent system chart. Modify existing vent system if necessary to achieve the best drying performance. Only rigid or flexible metal vent shall be used for exhausting.

If this is a new vent system

Vent material

Use a heavy metal vent. Do not use plastic or metal foil vent.

4" (102 mm) heavy metal exhaust vent and clamps must be used. DURASAFE™ venting products are recommended.

4"

102 mm

4" (102 mm) heavy metal exhaust vent

DURASAFE™ vent products can be purchased from your dealer or by calling the toll-free number listed on the cover of the Dryer User Instructions. For more information, see the “Assistance or Service” section of the Dryer User Instructions.

Rigid metal vent

For best drying performance, rigid metal vents are recommended.

Rigid metal vent is recommended to avoid crushing and kinking.

Flexible metal vent

Flexible metal vents are acceptable only if accessible for cleaning.

Flexible metal vent must be fully extended and supported when the dryer is in its final location.

Remove excess flexible metal vent to avoid sagging and kinking that may result in reduced airflow and poor performance.

Do not install flexible metal vent in enclosed walls, ceilings, or floors.

The total length of flexible metal vent should not exceed 734 ft (2.4 m).

Elbows

45° elbows provide better airflow than 90° elbows.

GoodBetter

Clamps

Use clamps to seal all joints.

Exhaust vent must not be connected or secured with screws or other fastening devices that extend into the interior of the duct and catch lint. Do not use duct tape.

Clamp

Exhaust

Recommended hood styles are shown here.

B

A

4"

(102 mm)

4" (102 mm)

A. Louvered hood style

B. Box hood style

The angled hood style (shown here) is acceptable.

4"

(102 mm)

2½" (64 mm)

11

Image 11
Contents 29 73.7 CM Electric Dryer Installation Instructions Parts needed Tools and PartsLocation Requirements Parts suppliedIt is your responsibility Installation ClearancesMobile Home Additional Installation Requirements Electrical Requirements U.S.AIf your outlet looks like this If connecting by direct wireElectrical Connection Canada Electrical Requirements CanadaElectrical Connection U.S.A. Only Power Supply Cord Direct WireInstall strain relief Style 1 Power supply cord strain reliefStyle 2 Direct wire strain relief Wire connection Power Supply CordRemove center silver-colored terminal block screw Wire connection Direct WireYou have completed your electrical connections. Now go to Under the outer terminal block screws hooks facing rightSqueeze hooked ends together. Tighten screws Secure cover with hold-down screwOptional 3-wire connection If this is a new vent system Vent material If using an existing vent systemVenting Requirements Determine vent path Special provisions for mobile home installationsPlan Vent System Level Dryer Install Vent SystemInstall Leveling Legs Vent system chartReversible Super Wide Side-Swing Door Reverse Door Swing OptionalReversible Large Side-Swing Door If the dryer will not start, check the following Complete InstallationU.S.A CanadaSécurité DE LA Sécheuse Outillage et pièces Exigences d’emplacementEspacement requis ’installation dans une maison mobile exigeSpécifications électriques Canada ’est à l’utilisateur qu’incombe la responsabilité deEn cas dutilisation du système dévacuation existant Exigences concernant l’évacuationLe clapet incliné de type boîte ci-dessous est acceptable Planification du système d’évacuationUne réduction de la longévité de la sécheuse Installation du système d’évacuationInstallation des pieds de nivellement Déterminer litinéraire dacheminement du conduitGrande porte réversible à pivotement latéral Mise à niveau de la sécheuseRaccordement du conduit d’évacuation Inversion du sens d’ouverture de la porte FacultatifSi la sécheuse ne démarre pas, vérifier ce qui suit Achever l’installationTous droits réservés W10150612B SP PN W10150613B