Maytag MDG30PNH, MDG30MNV installation manual Single-Phase Electrical Lead Connections

Page 18

a.Single-Phase (1ø) Wiring Connections/Hookup

The electrical input connections on ALL single-phase (1ø) gas dryers are made into the rear service box located at the upper left area of the dryer.

Single-Phase Electrical Lead Connections

Black

+

Positive

White or Red

+

Neutral or L2

Green

+

Ground

FOR 110V APPLICATIONS

FOR 208-240V APPLICATIONS

A ground lug is provided in the rear electrical box to connect your service ground.

14

Maytag Co.

113307 - 7

Image 18
Contents MDG30PNH / MDG30MNV Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Safety Precautions SectionStandards Specifications 13.6 kgSpecifications Installation Procedures UNPACKING/SETTING UPLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Multiple Dryer Common Venting Electrical Information Electrical RequirementsService Phase Wire Approx Circuit AMP Draw Single-Phase Electrical Lead Connections GAS Information Type of GAS Maytag Co Preparation for OPERATION/START-UP Preoperational Tests GAS Models onlyDual Timer Dryers Preoperational InstructionsReversing Timer SPIN/DWELL Adjustments Shutdown InstructionsSERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Routine Maintenance CleaningSuggested Cleaning Schedule Adjustments LubricationData Label Information Procedure for Functional Check Replacement Components Maytag Co 113307 Fire Suppression System In Action Fire Suppression SystemInstallation Water ConnectionsTypical Water Supply 06/26/08