Maytag MDG30PNH, MDG30MNV installation manual Maytag Co 113307

Page 32

2.For Models with Direct Spark Ignition (DSI) Module (Type I) Theory of Operation:

Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time (6-seconds), the flame sensor detects gas burner flame and signals the DSI module to keep the gas valve open as long as there is a call for heat. The DSI module will “LOCKOUT” if the gas burner flame is not sensed at the end of the trial for ignition period. The trial for ignition period will be repeated for a total of three (3) retries/trials (the initial try and two [2] more retries/trials). If the flame is not sensed at the end of the third retry/trial (inter-purge period of 30-seconds), the DSI module will “LOCKOUT” (light emitting diode [L.E.D.] diagnostic indicator flashes).

A steady L.E.D. indicator indicates normal operation.

No L.E.D. indicator indicates a power or an internal failure has occurred.

3.For Models with DSI Module (Type II)

Theory of Operation:

Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time (8-seconds), the flame sensor detects gas burner flame and signals the DSI module to keep the gas valve open as long as there is a call for heat. The DSI module will “LOCKOUT” if the gas burner flame is not sensed at the end of the trial for ignition period. The trial for ignition period will be repeated for a total of three (3) retries/trials (the initial try and two [2] more retries/trials). If the flame is not sensed at the end of the third retry/trial (inter-purge period of 30-seconds), the DSI module will “LOCKOUT” (a red L.E.D. diagnostic indicator will flash).

An unlit red L.E.D. diagnostic indicator indicates normal operation.

A lit green L.E.D. diagnostic indicator indicates dryer controller is calling for heat and that ALL interlocks have been satisfied.

28

Maytag Co.

113307 - 7

Image 32
Contents MDG30PNH / MDG30MNV Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Safety Precautions SectionStandards Specifications 13.6 kgSpecifications Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Multiple Dryer Common Venting Electrical Information Electrical RequirementsService Phase Wire Approx Circuit AMP Draw Single-Phase Electrical Lead Connections GAS Information Type of GAS Maytag Co Preparation for OPERATION/START-UP Preoperational Tests GAS Models onlyDual Timer Dryers Preoperational InstructionsReversing Timer SPIN/DWELL Adjustments Shutdown InstructionsParts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationData Label Information Procedure for Functional Check Replacement Components Maytag Co 113307 Fire Suppression System In Action Fire Suppression SystemInstallation Water ConnectionsTypical Water Supply 06/26/08