Intel SC450NX manual Exchange the Bezel Frame

Page 24

Exchange the Bezel Frame

To be installed in a rack, the server needs a new bezel frame with rectangular cutouts where the chassis handles fit. You need to remove the old bezel frame and install the new one from the rack kit.

1.Remove the bezel door: with the door open all the way (to the left), lift it upward to release it from its hinges on the chassis.

2.Remove the bezel frame: disengage the tabs that attach the bezel frame to the chassis by pressing each tab toward the center of the chassis while pulling the frame away.

3.Attach the new bezel frame by reinserting the tabs into their corresponding rectangular slots on the chassis.

4.Reattach the bezel door to its hinges on the chassis.

5.Continue the procedures beginning with “Attach the Chassis Handles” (page 14) through “Install the Server in the Rack” (page 18).

24

Image 24
Contents SC450NX MP Server Rack/Pedestal Kit Installation Guide Page Copyright ã 1998, Intel Corporation. All Rights Reserved Page Safety Guidelines Server PrecautionsPage Equipment Rack Precautions Viii Contents Page Introduction SC450NX MP Server Physical Specifications Tools You NeedConfiguring for Rack Mount Prepare the Slide AssembliesPrepare the Server Attaching the Bezel Frame and DoorAttach the Small Bar of the Slide Assembly to the Server Prepare the Equipment Rack Right-angle Bracket and Vertical RailCenter Bar and Large Outer Bar Assembly Install the Server in the Rack Installing the Server in the Rack Page Configuring for Pedestal Mount Install Chassis FeetInstall the Top and Side Covers Install Bezel Frame and Door Changing from Pedestal to Rack Remove the CoversExchange the Bezel Frame