Faria Instruments IS0250a owner manual Flush Mount

Page 35

Flush Mount

Step 1: Cut a square hole with rounded corners to match the dimensions as indicated in the figure below.

Step 2: Install mounting studs at the dimensions indicated in the figure.

Step 3: Insert the Antares unit from back of panel, placing the Flush Mount Gasket (GK0207) between the Antares and the panel.

Step 4: From back of panel, install back clamp. The four interior studs should line up with the four interior holes of the back clamp. Tighten the supplied nuts, washers, and lock washers to 7-10 inch pounds (slightly more than finger tight)

Step 5: Connect 9-pin (HN0604) and 20-pin (HN0605) wire harnesses to back of Antares unit. Proper connection requires the locking ring on each harness to be rotated about ¼ turn.

Step 6: Connect available inputs to corresponding wire harnesses. See pages 34-37 for detailed wiring information

32

Image 35
Contents IS0250a Page Part I Introduction Page Part I Introduction Image Button Functions Input Setup System SetupPage Tank Setup Depth Setup Screen Indicator Icons Gauge Screen 1 / Gauge Screen Quick View Screen Fuel Flow Manager Screen Depth / Temp Screen Tank Level Screen GPS Screen Radio Control Screen Main Menu Screen Lighting Total Amount of Fuel = Fuel Added + Fuel Remaining Fuel ManagerSystem Setup Units Calibrate Speedometer Calibration Trim Calibration Self Test Master Reset Diagnostics Alarm Icons Page Engine Alarms List Panel Mount InstallationFlush Mount Gauge Mount Gimble Mount HN0604 HN0605 HN0604 HN0605 Part VII FAQ / Troubleshooting Page Faria Marine Instruments