Furuno GP-1850D installation manual How to attach the N-P-8DFB connector

Page 12

How to attach the N-P-8DFB connector

Outer Sheath

Dimensions in millimeters.

Armor

Inner Sheath Shield

 

50

30

Cover with heat-shrink tubing and heat.

Remove outer sheath and armor by the dimensions shown left.

Expose inner sheath and shield by the dimensions shown left.

Cut off insulator and core by 10mm.

30

10

Clamp

Gasket Clamp

Nut

(reddish

 

brown)

 

Aluminum Foil

Trim shield here.

Insulator

Trim aluminum tape foil here.

Twist shield end.

Ship on clamp nut, gasket and clamp as shown left.

Fold back shield over clamp and trim.

Cut aluminum foil at four places, 90° from one another.

Fold back aluminum foil onto shield and trim.

1

5

Pin

Clamp Nut

Shell

Solder through the hole.

Expose the insulator by 1mm.

Expose the core by 5mm.

Slip the pin onto the conductor. Solder them together through the hole on the pin.

Insert the pin into the shell. Screw the clamp nut into the shell.

(Tighten by turning the clamp nut. Do not tighten by turning the shell.)

Figure 2-5 Fabrication of coaxial cable

2-3

Image 12
Contents Installation of Dgps Beacon Receiver Wiring Initial SettingsFirst Edition FEB Safety Instructions Safety Instructions for the InstallerEquipment Lists Standard supplyOptional equipment Iii System Configuration Display UnitInstallation of Standard Equipment Installation of Display UnitMounting considerations Mounting procedure Tabletop, overhead mountingInstallation of Antenna Unit Flush mounting of display unitWiring Power cableAntenna unit GroundExtending antenna cable length How to attach the N-P-8DFB connector Initial Settings Nmea SettingNmea port Dgps port RTCM104OUTPUTOutput Data Sentences Input/Output data sentencesBaud Rate Setting GP-1850D only Antenna HeightBeacon Frequency Setting GP-1850D only Beacon Baud RateBeacon Frequency Auto Installation of Dgps Beacon Receiver for GP-1850 HP-2NDisassembly ProcedureInstallation of Dgps receiver Dismounting chassis assemblyInstallation of Dgps beacon receiver Wiring the Cable assembly Attaching chassis assembly Checking the Dgps installation 10 Memory, I/O Test DisplayConnecting Dgps beacon receiver 11 Connecting Dgps beacon receiverPage Page Page Page Page Page Page Page Page Page Page Page