Furuno GP-1850D installation manual Attaching chassis assembly

Page 24

Chassis Assembly

A

Panel Assembly

A

view

 

Attach two ties

 

(CV-100, supplied).

8P connector

 

to J8

 

 

 

J8

6P connector

J7

Panel

to J7

 

 

Assembly

Figure 4-8 Attaching chassis assembly

11.Reassemble the display unit.

Nut

Washer

Torque:

1.37-1.57 Nm

Nut

Torque:

0.74-0.78 Nm

M3 X 10 (10pcs.)

Torque: 0.74-0.78 Nm

Figure 4-9 Remounting the cover

Note : When reattaching the cover, confirm the following parts are attached.

Inside of the cover : Shield gasket, GN gasket (See Figure 4-10.)

On ANLG Board : Connector gasket (See Figure 4-1.)

4-6

Image 24
Contents Installation of Dgps Beacon Receiver Wiring Initial SettingsFirst Edition FEB Safety Instructions Safety Instructions for the InstallerEquipment Lists Standard supplyOptional equipment Iii System Configuration Display UnitInstallation of Standard Equipment Installation of Display UnitMounting considerations Mounting procedure Tabletop, overhead mountingInstallation of Antenna Unit Flush mounting of display unitWiring Power cableAntenna unit GroundExtending antenna cable length How to attach the N-P-8DFB connector Initial Settings Nmea SettingNmea port Dgps port RTCM104OUTPUTOutput Data Sentences Input/Output data sentencesBaud Rate Setting GP-1850D only Antenna HeightBeacon Frequency Setting GP-1850D only Beacon Baud RateBeacon Frequency Auto Installation of Dgps Beacon Receiver for GP-1850 HP-2NDisassembly ProcedureInstallation of Dgps receiver Dismounting chassis assemblyInstallation of Dgps beacon receiver Wiring the Cable assembly Attaching chassis assembly Checking the Dgps installation 10 Memory, I/O Test DisplayConnecting Dgps beacon receiver 11 Connecting Dgps beacon receiverPage Page Page Page Page Page Page Page Page Page Page Page