Setup
Filling Master Divider Valve
Refer to FIG. 5. when performing this procedure.
LUBE POINT
SECONDARY
MASTER
BLEED
HERE
CYCLE PUMP
TI11000
FIG. 5
1.Verify that all port plugs or performance indicators have been removed from all indicator ports in the master divider valve.
2.Verify that the system pump is properly connected to the inlet port of the master divider valve.
3.Cycle the system pump sufficiently to fill the main feeder line between the pump and the master divider valve and the lubricant is observed being discharged from all of the indicator ports on the front of the master divider valve with no evidence of included air.
4.Reinstall the master divider valve port plugs or per- formance indicators into their respective positions.
6 | 312497F |