Trane DX1C100A9H31B, UX1C100A9H41B manual Horizontal Venting, Vent and Inlet AIR Connections

Page 16

Installer’s Guide

VENT AND INLET AIR CONNECTIONS

p

 

 

Seal VENT PIPE

 

 

 

 

 

 

 

 

with RTV sealant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Front of Furnace

Seal INLET AIR PIPE

with RTV sealant

NOTE:

Follow venting instructions carefully when using PVC cement.

IMPORTANT:

WHEN THE FACTORY SUPPLIED "OFF-SET" (2X3 REDUCING COUPLING) IS USED FOR 3" VENT PIPE INSTALLATION, MAKE SURE THE MARKING "TOP" IS

LOCATED ON THE TOP SIDE OF THE PIPE.

a

 

LABEL

 

SAYS

 

"TOP"

 

STRAIGHT SIDE MUST BE

ON BOTTOM FOR PROPER

CONDENSATE DRAINAGE.

All joints must be water tight. Flue condensate is some- what acidic, and leaks can cause equipment damage.

Connection of the pipe and collar of the combustion air inlet should just be a friction fit. It is recommended that the inlet air joint be sealed with RTV type sealant to allow the joint to be separated for possible future ser- vice. The inlet and vent pipes must be properly sup- ported throughout the entire length.

Connection of the vent pipe to the vent collar should also be accomplished using RTV type sealant. This type sealant provides a connection which remains flexible and can be separated in the future if service needs re- quire the removal of the vent pipe for service or clear- ance.

NOTE:

s

2" TO 3" COUPLING

#CPL00838

FACTORY SUPPLIED ONLY WITH THE FOLLOWING MODELS:

UC120 & DC120

UX120 & UY120

UX100 & UY100 UX080C960

ALL DX & DY MODLES UX3 & DX3

UH3 & DH3

To ensure proper operation at the vent lengths indi- cated, the combustion air inlet and vent terminals should be in the same pressure zone. Terminating the vent and inlet in different pressure zones will change the maximum vent lengths and may cause nuisance tripping of the pressure switch(es). The amount of change can not be predicted. The selection of the inlet and outlet terminal locations are the responsibility of the designer/installer. If the installer chooses separate pressure zones for the terminals, the combustion air inlet termination must be in the higher (more positive) pressure zone.

HORIZONTAL VENTING

NOTE:

Vent termination kit BAYAIR30AVENTA or BAYVENT200B may be used instead of the horizontal and vertical termination options shown in the follow- ing figures.

FURNACE

VENT

OUTLET

HORIZONTAL INSTALLATION

(Upflow/ Horizontal or Downflow/ Horizontal)

NOTE:

In horizontal venting when the factory supplied “off- set” (2X3 reducing coupling) is used for 3” vent pipe installation, make sure the marking “Top” is located on the top side of the pipe. The straight side must be on bottom for proper condensate drainage. This coupling is factory supplied only with the following models: *UC120 & *DC120, *UX120 & *UY120 *UX100 & *UY100, *UX808C960, and all *DX & *DY models.

16

18-CD22D1-8

Image 16
Contents Installer’s Guide Safety Section Carbon Monoxide Poisoning HazardInstaller’s Guide Contents Installer’s Guide Drawing UX1-H OutlineDX1-H Upflow Installation Downflow InstallationsHorizontal Installation Subbase Cross SectionAIR for Combustion and Ventilation Outside AIR is RecommendedConfined Space Duct Connections Return AIR Duct SystemsTypical Upflow Return AIR Filter Installations Optional Filter Rack Installation for BOT- TOM ReturnReturn AIR Filters Upflow Furnace onlyAirflow Alternate Upflow Filter Clip Bracket Installation KIT09224 Typical Downflow Furnace Return AIR Filter InstallationsModels Cabinet Filter Numbers QTY & SizeGeneral Venting Vent Fitting Material Plastic PVC Vent Fitting MaterialBonding of PVC Horizontal Venting Vent and Inlet AIR ConnectionsUpflow Furnace Inside Corner Detail Possible Configurations for TWO Pipe Venting Systems Horizontal Venting Through Wall BAYVENT200BCombustible Material Wall Noncombustible Material WallBAYAIR30AVENTA BAYVENT200B Downward Venting Direction of Stainless Steel FittingInstaller’s Guide Used Through Chimney That Vents Another GAS Appliance EE CautionCondensate Drain Instructions Vertical ApplicationsUpflow Vertical Horizontal ApplicationsDownflow Vertical DownflowVertical Downflow HorizontalElectrical Connections Twinning FurnacesStage Heating only Thermostat GAS Piping Stage Heat / 1 Stage Cool ThermostatUpflow Left Hand GAS Piping Orifice Sizes Combustion and Input CheckFinal Manifold Pressure Settings High Altitude DerateReinstallation of the Burner BOX Cover Start UP and AdjustmentPreliminary Inspections Lighting Instructions Sequence of OperationAirflow Adjustment Room AIR Thermostat Heat Anticipator AdjustmentBurner BOX Temperature Limit Device Power FailureReset After Burner BOX Limit Shutdown Limit switch must be reset by a qualified servicerIntegrated Furnace Control Error Flash Codes Trane