9 | Turbine Installation |
|
|
|
|
comparative data for a region or a specific location. However, be very careful when relying only on this information as such data quite often tends to be measured at very high altitudes and may not be useful at lower and more practical heights.
2.As a general rule it is best to install the turbine at the highest permissible position and far removed in proximity to trees and other adjacent buildings or structures.
3.Always take into consideration all possible safety consequences of the turbine installation at the local site.
Figure 2.2 Wind Map for USA
There are several options for the installation of the HONEYWELL™ Wind Turbine. The turbine may be installed using a pole, a QUADPOD™ Mount on a flat roof with a ballast or a QUADPOD™ Mount on a pitched roof with a ROOFBOX™ Mount. These are described in the next section.
Building codes and installation requirements vary considerably between various townships, cities, states and countries. Make sure that all required local permits are obtained BEFORE beginning installation. In all cases installation must be conducted by a licensed and trained professional contractor and electrician. In some locations the local electric utility may have strict regulations about renewable energy technologies such as this wind turbine and other interconnect agreements and therefore it is highly recommended that they are also contacted BEFORE installation.