Honeywell WT6500 owner manual Turbine Wiring Overview, SMARTBOXController

Page 25

Turbine Installation

18

 

 

 

 

Turbine Wiring Overview

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AC IN

 

 

 

L1 N GND

AC INPUT

FROM MAIN SWITCH BOARD SINGLE PHASE 120V 15AMP

 

 

 

 

 

 

 

 

 

(2) #12 THWN-2

+ #6 GND ¾” CONDUIT

 

 

 

 

 

 

 

 

 

 

 

 

L1 N GND

AC OUTPUT TO SUB SWITCH BOARD SINGLE PHASE 120V 15AMP

 

 

 

 

 

 

 

 

 

(2) #12 THWN-2

+ #6 GND ¾” CONDUIT

 

 

 

 

 

 

 

SMARTBOX™Controller

 

 

 

CAT5E or CAT6

 

 

 

 

 

 

 

 

 

 

 

G O R

 

 

 

 

 

 

 

 

 

T

G/W OHR

 

 

 

 

 

 

 

 

TURBINE

 

 

BLU

#4+2-THWN#4(2)GND CONDUIT1” FEET.6DISTANCEMAX

 

 

 

 

 

 

 

HT

BLU/W

 

 

 

 

 

 

 

 

 

 

BRN

 

 

 

 

 

 

 

 

 

HT

BRN/ W

 

 

 

 

 

 

 

 

 

 

 

N GR

 

 

 

 

 

 

 

 

 

HT

 

N/ WGR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12V

12V

 

 

 

 

 

 

 

 

 

 

 

12V

12V

 

 

 

 

 

 

 

 

 

 

 

12V

12V

 

 

 

 

 

 

 

 

 

#6 GND

FEET.

 

 

 

 

 

 

 

 

 

 

 

(2) #10 THWN-2 + ¾” CONDUIT MAX DISTANCE 3

 

 

 

 

 

 

 

 

ORG

 

 

 

 

 

 

 

 

 

 

 

HT

ORG/W

 

 

 

 

 

 

 

 

 

 

 

 

BLU

 

 

 

 

 

 

 

 

 

 

 

HT

BLU/W

 

 

 

 

 

 

 

GND

 

 

 

 

BRN

 

 

 

 

 

 

 

 

 

 

T /W HBRN

 

 

 

 

 

 

 

#4

 

 

 

 

GRN

 

 

 

 

 

 

POLES

EARTH GROUND STAKE

BOXJUNCTIONTURBINE

 

 

 

 

 

 

SIZECONTROLLERTOTURBINESEE

1SHEETONCHART

 

 

 

HT

GRN/W

 

 

 

 

TURBINE

 

 

 

 

 

 

 

 

 

 

 

 

OPTIONAL

drawing pages 36-37.

 

See Appendix for one-line electrical

 

Wiring Overview

 

Figure 2.9

HONEYWELL™ Wind Turbine WT6500 Owner’s Manual - Rev 10

Image 25
Contents Honeywell Wind Turbine Thank You III Safety Icons Safety InformationImportant Safety Instructions Page Table of Contents Specifications Introduction Product Description Shipping ContentsBefore Installing the Honeywell Wind Turbine Lift Point Turbine Mounting WiringIntroduction Personal Injury and Property Damage Hazard Turbine with Electrical Systems Site SelectionTurbine Installation Mounting Options Quadpod Mount Pole MountRoofbox Mount Ballast Mount Turbine WiringTurbine Components Turbine Component DiagramSmartbox Controller Smartbox ControllerRecommended Battery Type Battery BoxJunction Box Enclosure Junction BoxWind Generator Junction Box Block DiagramSMARTBOXController Turbine Wiring OverviewTurbine Wiring and Distances DC Power WiringTurbine Current Rating and Wiring Shock or Fire Hazard Turbine Over-Current ProtectionJunction BOX Control Wiring Turbine Smartbox ControllerShock Hazard GroundingOperation To Disable Wind Turbine Disconnect AC PowerTurbine Installation Specifications Technical Specifications Warranty Information Limited Warranty Year Limited WarrantyLimitations and Exclusions on Limited Warranty Legal Remedies Appendix Turbine Installation Drawings Pole Mount Roofbox Mounting Roofbox with Quadpod Mounting Ballast Mounting Electrical One-Line Drawing Part Symbols ListSheet Notes Appendix WindTronics
Related manuals
Manual 46 pages 38.49 Kb