Desa (V)TC36P SERIES, (V)TC36N SERIES Installation Planning, Horizontal Termination Installation

Page 8

8

VENTING INSTALLATION INSTRUCTIONS

Installation Planning

VENTING INSTALLATION INSTRUCTIONS

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent installation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation

IMPORTANT: Horizontal square terminations require only in- ner portion of wall firestop. Horizontal installations using round termination require exterior portion of wall firestop (see Figure 14, page 10).

1.Set the fireplace in its desired location and determine the route your horizontal venting will take. Do not secure the fireplace until all venting has been installed. Some installations require sliding the fireplace in and out of position to make final venting connections. Figures 14 through 18 on pages 10 through 12 show different configurations for venting with horizontal termination that will help you decide which application best suits your instal- lation. Check to see if wall studs or roof rafters are in the path of your desired venting route. If they are, you may want to adjust the location of the fireplace.

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes. Push pipe sections together and twist one section clockwise approxi- mately one-quarter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue collar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace flue collar. If there are long portions of venting run, pre-assembled pipe sections may be installed as subassemblies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

Male

Female Slots

Locking

Lugs

Figure 8 - Vent Pipe Connections

 

 

 

Vent Opening

 

 

 

 

 

 

 

Combustible Wall

10

3

/4" Inside Framing

 

 

 

 

3

 

 

 

 

 

 

10

/4"

 

 

 

(273 mm)

 

 

 

 

 

 

 

 

 

 

(273 mm)

 

 

 

 

10

3

/4"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(273 mm)

 

 

 

 

 

 

 

 

 

 

 

 

(Framing

 

 

Vent Opening

 

Detail)

 

 

 

 

 

 

 

Noncombustible Wall

 

 

 

 

8

1

/2"

 

 

 

 

 

 

 

 

 

 

 

 

 

(216 mm)

 

 

 

 

 

 

Center

of Hole

Figure 9 - Vent Opening Requirements

www.desatech.com

116192-01B

Image 8
Contents Save this manual for future reference For Your SafetyFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationSafety Information Product Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Siding Standoff Combustible Horizontal Termination Configurations Vertical Horizontal HCorner Installation Venting with Two 90 Elbows Vertical Horizontal H Horizontal H 1 +Min Max 12 max 18 max 20 max Vertical Horizontal H 1 + Min Max 12 max 18 max 20 maxConnect a section of pipe and extend up through the hole Installation for Vertical TerminationFlat Ceiling Installation Vertical Termination Configurations Vertical Horizontal H 1 + Min Max 20 maxVenting with One 90 Elbow Vertical Horizontal H Min Max 20 max= 40 max High Altitude InstallationVertical Venting Venting Installation Fireplace InstallationInstalling Optional Blower Accessories Check GAS TypeModel BKT Installation By turning knob fully counterclockwise before continuingDecal on the firebox bottom approximately 12 in front Blower see FigureInstalling GAS Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Blower see ,Or servicing. Correct all leaks at once Connecting Fireplace to GAS SupplyChecking GAS Connections Installing Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsRemoving Louver Panels Installing Remote ReceiverREMOVING/REPLACING Glass Door Removing Glass Doors Installing Lava Rock and Glowing EmbersCleaning Glass Door Installing Brick Liner Models BL36DASA and BL36DHASA For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsManual Lighting Procedure To Turn OFF GASOptional HAND-HELD Remote Operation Shutting Off Burners Only pilot stays litSafety Features Manual ModeAuto Thermostatic Mode ON/OFF Series Model GhrcbOperating Optional Blower Accessory Pilot AssemblyInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatCleaning and Maintenance Glass DoorPilot and Burners LogsTroubleshooting Is low Remote control Inlet gas pressure is too lowCompany Thermopile leads disconnected or imGas leak. See Warning statement AboveReplacement Parts Service HintsTechnical Service SpecificationsIllustrated Parts Breakdown Models TC36N, VTC36N, TC36P and VTC36PParts List KEY Part Number TC36N/P VTC36N/P Description QTYBurner Assembly for Models TC36N, VTC36N, TC36P and VTC36P KEY Part Number Description QTY Accessories Owners Registration Form Industrial Drive Box Bowling Green, KY 116192-01B Model Serial No Date Purchased Industrial Drive P.O. Box