Desa (V)K36EP, (V)K36EN installation manual Corner Installation

Page 11

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

11

VENTING INSTALLATION INSTRUCTIONS

Continued

CORNER INSTALLATION

Recommended Applications:

Corner ground floor installation

Ground floor installation where pipe vents horizontally through wall (over 12" horizontal pipe)

Basement installation where one foot clearance from ground to termination is possible

 

Vertical (V)

Required

Vertical (V)

Vertical Pipe

Horizontal (H)

*43 1/2" min.

None

30" max.

54 1/2" min.

1 ft.

48" max.

66 1/2" min.

2 ft.

60" max.

78 1/2" min.

3 ft.

84" max.

90 1/2" min.

4 ft.

20' max.

* Ground Floor Corner Venting

Not to Exceed

(H) Limits

Square

Termination

Wall

Firestop

45°

Elbow

90° Elbow

As Required for (V) See Chart for Pipe Section Required

Not to Exceed

(H)Limits 90° Elbow

Wall

Firestop

45° Elbow

Square Termination

12" Minimum

Figure 15 - Horizontal Termination Configuration for Corner Installation Using One 90° Elbow

SNORKEL TERMINATION INSTALLATION

Recommended Applications:

Installations requiring a vertical rise on building exterior

Any installation using snorkel termination to achieve one foot above ground

Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building. If installing snorkel termination below grade, you must provide proper drainage to prevent water from entering snorkel termination (see Figure 16). Do not back fill around snorkel termination.

Snorkel

Snorkel

Termination

Termination

Wall

 

 

Firestop

 

90° Elbow

 

12"

 

Minimum

 

45°

12"

Elbow

 

Minimum

 

 

Adequate

 

Drainage

Snorkel Termination

12"

Minimum

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

For morevisit www..com

111924-01B

Image 11
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Safety Information Table of ContentsLocal Codes Product IdentificationLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Framing and Finishing ClearancesBalcony with Perpendicular Side Wall Location of Termination CAPInstallation Precautions Venting Installation InstructionsHorizontal Termination Installation Installation PlanningInstalling Siding Standoff Combustible Exterior Vertical V Horizontal H Horizontal Termination ConfigurationsCorner Installation Venting with Two 90 Elbows Horizontal System Installation Using TWO ElbowsFlat Ceiling Installation Installation for Vertical TerminationVenting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting High Altitude InstallationCheck GAS Type Fireplace InstallationInstalling Optional Blower Accessory Model BK InstallationAttaching Speed Control to Firebox Model BKT InstallationInstallation Items Needed Installing GAS Piping to Fireplace LocationBlower Wiring Diagram Checking GAS Connections Connecting Fireplace to GAS SupplyInstallation Items Needed Pressure Testing Gas Supply Piping SystemRemoving Louver Panels Pressure Testing Fireplace Gas ConnectionsREMOVING/REPLACING Glass Door Removing Glass Door Cleaning Glass DoorWall Switch Installation Installing LOGS, Lava Rock and Glowing EmbersOptional Remote Control Wiring DiagramTo Turn OFF GAS To Appliance For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsBurner Flame Pattern Operating Optional Blower AccessoryPilot Assembly Inspecting BurnersLogs Cleaning MaintenanceGlass Door Pilot and BurnersObserved Problem Possible Cause Remedy TroubleshootingTop Gas leak. See Warning statement atSpecifications Replacement PartsService Hints Technical ServiceModels Illustrated Parts BreakdownKEY Part Number Description QTY Parts ListBurner Assembly for Models VK36EN, VK36ENH, VK36EP, VK36EPH Parts List Accessories Owners Registration Form Postage Required 111924-01B Warranty Information