Desa CDV41N/P, CDV37N/P installation manual Vent Pipe Connections

Page 9

OWNER’S MANUAL

VENTING INSTALLATION

Continued

3.Attach vent pipe assembly to the fire- place. Set fireplace in front of it’s per- manent location to insure minimum clearances. Mark the wall for a 10" square hole (for noncombustible mate- rial such as masonry block or concrete, a 7 1/2" diameter hole is acceptable). See Figure 12. The center of the hole should line up with the center-line of the hori- zontal rigid vent pipe. Cut a 10"x10" (254mm x 254mm) square hole through combustible exterior wall (7 1 /2" [190mm] diameter hole if noncombus- tible). Frame as necessary (see Figure 12).

 

4" Clamp

Female

7" Clamp

Locking

 

Lugs

 

 

Spacer

4.Apply a bead of non-hardening mastic around the outside edge of the vent cap. Position the vent cap in the center of the 7 1/2" or 10" hole on the exterior wall with the arrow on the vent cap pointing up. Insure proper clearance of 1" to combustibles is maintained. At- tach the vent cap with four wood screws supplied (see Figure 13). Note: Re- place the wood screws with appropri- ate fasteners for stucco, brick, concrete, or other types of siding.

WARNING: Do not recess vent termination in to any wall. This will cause a fire hazard.

For vinyl siding use vinyl siding stand- offs between vent cap and exterior wall. The vinyl siding standoff prevents ex- cessive heat from melting the vinyl sid- ing material. Bolt the vent cap to the standoff. Apply non-hardening mastic around outside edge of the standoff in- stead of the vent cap assembly. Use wood screws provided to attach the

6.Carefully move the fireplace with vent assembly attached toward the wall and insert the vent pipe into the horizontal termination. The pipe overlap should be a minimum of 1 1/4". Apply silicone to the outer pipe connection. Fasten all vent connections with screws provided. Refer to Fireplace Installation on page 16 for instructions on securing unit to framing or floor.

7.Slide the wall thimble against the inte- rior wall surface and attach with screws provided (see Figure 15).

Cut Vinyl Siding

Away to Fit

Standoff

Wood Screw

Standoff

 

Spring

Male

4" Flex

Pipe

Slots

 

 

7" Flex

standoff. See Figure 14.

5.Slide the wall thimble over the vent pipe before connecting the horizontal run to the vent cap (see Figure 15).

UP

Nut

Apply Mastic

to All Four Sides Vent Cap

Bolt

Pipe

Rigid Vent Pipe Flexible Vent Pipe

Figure 11 - Vent Pipe Connections

Vent Opening

Combustible Wall

10"

(254mm)

10"

(254mm)

(Framing

Apply Mastic to All Four Sides

UP

Wood

Screw

Vent Cap

Figure 13 - Installing Horizontal Vent Cap

Figure 14 - Installing Vinyl Siding Standoff

Interior Wall

Surface

Wall

Thimble

Vent Cap

Vent Opening

Detail)

(Horizontal

Screw

 

Termination)

 

Noncombustible Wall

7 1/2" (190mm)

Figure 12 - Vent Opening Requirements

Horizontal

Vent Pipe

Figure 15 - Connecting Vent Cap with Horizontal Vent Pipe

Continued

105541

9

Image 9
Contents For Your Safety For Your Safety What to do if YOU Smell GASCDV37N/PA,B and CDV41N/PA,B DIRECT-VENT Fireplace NATURAL/PROPANE/LP Safety InformationProduct Identification Product FeaturesLocal Codes Glossary TermsClearances PRE-INSTALLATION PreparationLocation and Space Requirements Framing and FinishingLocation of Vent Termination PRE-INSTALLATION Preparation General VentingGeneral Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a ChaseSnorkel Termination Installation for Horizontal TerminationVent Pipe Connections Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationCathedral Ceiling Installation Venting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting Parts Lists for Venting Kits and Components High Altitude InstallationComfort Glow Rigid Venting Comfort Glow Flexible VentingInstalling Optional Blower Accessory Fireplace InstallationInstalling GA3750/CDA3620T Blowers Check GAS TypePlug in blower power cord Installation Items Needed Installing GAS Piping to Fireplace LocationConnecting Fireplace to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Close manual shutoff valve see Fig- ure Pressure Testing Fireplace Gas ConnectionsInstalling Battery into Receiver Wireless HAND-HELD Remote ControlInstalling 9-Volt Battery in Hand- Held Remote Control Unit REMOVING/REPLACING Glass DoorAttaching Magnetic Decorative Brass Strips Installing Optional Brick Liner CD8037A/ CD8041Replace glass door. See Removing/Re- placing Glass Door, Installing LOGS, Lava Rock and Glowing EmbersManual Lighting Procedure For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsPilot Assembly Operating Optional Blower AccessoryInspecting Burners HAND-HELD Remote OperationGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Wiring Diagram Replacement PartsService Hints Technical ServiceAccessories SpecificationsTHERMOSTATICALLY- Controlled Blower KIT CDA3620T Manual Blower KIT GA3750CDV41NA,B Illustrated Parts BreakdownDIRECT-VENT Fireplace CDV37NA,B CDV41NA,B Parts ListCDV37PA,B CDV41PA,B DIRECT-VENT Fireplace CDV37PA,B CDV41PA,B Warranty Information