Desa CDV41N/P PRE-INSTALLATION Preparation General Venting, Location of Vent Termination

Page 5

OWNER’S MANUAL

PRE-INSTALLATION PREPARATION

GENERAL VENTING

These models are approved for use with

5

Continued

13"

29"

10 1/4"

8 3/4"

9 1/4"

41"

37"

41"

371/2"

411/2"

58"

Simpson Dura-Vent 6 /8" direct-vent pipe components and terminations as well as both flex and rigid Comfort Glow vent components.

Your fireplace is approved to be vented either through the side wall, or vertically using the following guidelines:

Only use Comfort Glow or Simpson Dura- Vent GS venting components or kits spe- cifically approved for this fireplace.

Minimum clearance between vent pipes and combustible materials is 1" (25 mm),

except where stated otherwise.

• Combustible material may be flush with

Nailing Tabs the top front of fireplace with a maxi-

mum thickness of 3/4".

• Do not recess venting terminals into a

wall or siding.

Note: Where two numbers are given the top number is exclusive to the 37" Fireplace and the bottom number is exclusive to the 41" Fireplace

Figure 6 - Framing Clearances for Corner Installation

Install horizontal venting with a 1/4" rise

 

for every 12" of run toward the termination.

You may paint the vent terminal with

 

450ºF (232ºC) heat-resistant paint to co-

Note: There must be a minimum clearance of 18" above top of louver opening when installing a television or entertainment center above the fireplace.

 

 

 

1

 

 

 

2

 

 

 

3

A

 

 

Wall

 

 

 

 

 

 

4

B

 

 

5

 

C

 

6

 

 

 

 

 

D

 

 

 

E

7

 

 

 

 

 

 

F

 

 

 

G

ordinate with the exterior finish.

• There must not be any obstruction such

as bushes, garden sheds, fences, decks, or utility buildings within 24" from the front of the termination cap.

Do not locate termination cap where ex- cessive snow or ice build up may occur. Be sure to clear vent termination area af- ter snow falls to prevent accidental block- age of venting system. When using snow blowers, do not direct snow towards vent termination area.

LOCATION OF VENT

TERMINATION

 

 

 

Top of Louver Opening

 

 

 

 

 

Ref.

Mantel Depth

Ref.

Mantel from Top

 

 

 

 

of Louver Opening

 

 

 

 

 

 

1

14" (356mm)

A

16" (406mm)

 

 

 

 

 

 

2

12" (305mm)

B

14" (356mm)

 

3

10" (254mm)

C

12" (305mm)

 

 

 

 

 

 

4

8" (203mm)

D

10" (254mm)

 

 

 

 

 

 

5

6" (152mm)

E

8" (203mm)

 

 

 

 

 

 

6

4" (101mm)

F

6" (152mm)

 

 

 

 

 

 

7

2" (51mm)

G

4" (101mm)

 

 

 

 

 

 

Figure 7 - Clearances for Combustible Mantels

When locating vent termination, it is impor- tant to observe the minimum clearances shown in Figure 8, page 6. You will avoid extra framing by positioning your fireplace against an already existing framing mem- ber. The sides of the fireplace may be posi- tioned directly against combustible walls.

*Check with local codes or with the current CAN/CGA B149 [.1 or .2] Installation Codes for Canada or the USA Installations follow the current National Fuel Gas Code, ANS Z223.1, also known as NFPA 54.

Continued

105541

5

Image 5
Contents CDV37N/PA,B and CDV41N/PA,B For Your SafetyFor Your Safety What to do if YOU Smell GAS DIRECT-VENT Fireplace NATURAL/PROPANE/LP Safety InformationProduct Identification Product FeaturesLocal Codes Glossary TermsClearances PRE-INSTALLATION PreparationLocation and Space Requirements Framing and FinishingLocation of Vent Termination PRE-INSTALLATION Preparation General VentingGeneral Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a ChaseSnorkel Termination Installation for Horizontal TerminationVent Pipe Connections Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Cathedral Ceiling Installation Installation for Vertical TerminationFlat Ceiling Installation Venting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting Parts Lists for Venting Kits and Components High Altitude InstallationComfort Glow Rigid Venting Comfort Glow Flexible VentingInstalling Optional Blower Accessory Fireplace InstallationInstalling GA3750/CDA3620T Blowers Check GAS TypePlug in blower power cord Installation Items Needed Installing GAS Piping to Fireplace LocationChecking GAS Connections Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Close manual shutoff valve see Fig- ure Pressure Testing Fireplace Gas ConnectionsInstalling Battery into Receiver Wireless HAND-HELD Remote ControlInstalling 9-Volt Battery in Hand- Held Remote Control Unit REMOVING/REPLACING Glass DoorAttaching Magnetic Decorative Brass Strips Installing Optional Brick Liner CD8037A/ CD8041Replace glass door. See Removing/Re- placing Glass Door, Installing LOGS, Lava Rock and Glowing EmbersManual Lighting Procedure For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsPilot Assembly Operating Optional Blower AccessoryInspecting Burners HAND-HELD Remote OperationGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Wiring Diagram Replacement PartsService Hints Technical ServiceAccessories SpecificationsTHERMOSTATICALLY- Controlled Blower KIT CDA3620T Manual Blower KIT GA3750CDV41NA,B Illustrated Parts BreakdownDIRECT-VENT Fireplace CDV37NA,B CDV41NA,B Parts ListCDV37PA,B CDV41PA,B DIRECT-VENT Fireplace CDV37PA,B CDV41PA,B Warranty Information