SNORKEL TERMINATION INSTALLATION

Recommended Applications:

• Installations requiring a vertical rise on building exterior

• Any installation using snorkel termination to achieve one foot above ground

Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building. If installing snorkel termina- tion below grade, you must provide proper drainage to prevent water from entering snorkel termination (see Figure 16). Do not back fill around snorkel termination.

Snorkel Termination

Snorkel

Termination

12"

Minimum

Snorkel

 

Wall

Termination

 

 

Firestop

 

90° Elbow

 

 

12"

Minimum 45° Elbow

Adequate

Drainage

12"

Minimum

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

HORIZONTAL SYSTEM INSTALLATION USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

Vertical (V)

Horizontal

Horizontal (H1) +

 

(H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

45° Elbow

Venting with Two 90° Elbows

Vertical (V) Horizontal (H1)

 

Horizontal (H2) 45° Elbow

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

Figure 17 - Horizontal Termination Configuration for Venting

Using Two 90° Elbows

111906-01F

www.desatech.com

11

Image 11
Contents What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsLocal Codes Product FeaturesProduct Identification Clearances Pre-Installation PreparationLocation and space requirements Framing and finishing Framing Clearances for Installation Against an Exterior WallTermination CAP AIR Supply Inlet GAS Meter Location of Termination CapHorizontal Termination Installation Venting Installation InstructionsInstallation Precautions Installation PlanningVent Pipe Connections Vent pipe before connecting horizontal run to vent cap see Ground Floor Installation Horizontal Termination ConfigurationsVenting with Two 90 Elbows Snorkel Termination InstallationOffset with Wall Strap and 45 Elbows Flat Ceiling InstallationVertical Venting Vertical Termination ConfigurationsVenting with One 90 Elbow Installing optional blower accessories Fireplace InstallationHigh Altitude Installation Parts lists for venting kits and componentsAttaching Speed Control to Firebox Model BKT InstallationInstallation Items Needed Installing Gas Piping to Fireplace LocationBlower Wiring Diagram Checking GAS Connections Connecting Fireplace to GAS SupplyInstallation Items Needed Pressure Testing Gas Supply Piping SystemPressure Testing Fireplace Gas Connections Installing Remote ReceiverRemoving Louver Panels Installing Brick liner Models BL42DASA and BL42DHASACleaning Glass Door Removing/Replacing Glass DoorInstalling Rear Brick Panel Installing logs, lava rock Glowing embersLighting Instructions For your safety read Before lightingOperating Fireplace Remote Operation Manual Lighting ProcedureTo Turn OFF GAS To Appliance OpTIONAL Hand-HeldOperating optional GWMT1 Wall Mounted Thermostat Operating optional blower accessoryThermostat Series Model HRC200 Burner Flame Pattern Cleaning MaintenancePilot assembly Inspecting BurnersLogs TroubleshootingTo clean pilot. This can damage pilot unit Pilot and burnersTroubleshooting Above Gas leak. See Warning statementSpecifications Replacement PartsService Hints Technical ServiceAccessories Illustrated Parts Breakdown 108331-01 108331-02 109082-02 Parts ListIllustrated Parts Breakdown VV42PHB1 and CHDV24NR-B 111906-01F 111906-01F Keep this Warrant Warranty Information