Desa V42V-A installation manual VV42PHB1 and CHDV24NR-B

Page 33

Parts List

BURNER ASSEMBLy FOR MODELS V42N-A, VV42NSB(1), VV42NHB(1), V42P-A, V42PSB(1),

VV42PHB(1) AND CHDV24NR-B

This list contains replaceable parts used in your fireplace. When ordering parts, follow the instructions listed under Replacement Parts on page 28 of this manual.

KEY

 

NO. PART NO. DESCRIPTION

QTY.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

108373-01 Burner Assembly Base

108330-01 Pan Burner Assembly

11165

Screw #10 x 5/8" MD TR BLK

108376-01

Tube Burner

104506-24 Pan Burner Orifice (Natural Gas #46)

104506-20 Pan Burner Orifice (Propane/LP)

108084-02 Pilot Assembly (Natural Gas)

108084-03

Pilot Assembly (Propane/LP)

11102

Screw #8-32 x 3/8" PPH Zinc

108755-01

Pilot Bracket

104506-25 Tube Burner Orifice (Natural Gas)

104506-20 Tube Burner Orifice (Propane/LP Gas)

14528

Brass Elbow Fitting

14554

Tubing Assembly

14500

Brass Fitting

14389

Millivot Valve (Natural Gas)

14390

Millivolt Valve (Propane/LP)

14253

Flexible Gas Line

11107

Screw #10-32 x 1/4" PPH Zinc

26808

Valve Bracket

26827

Switch Bracket

14261

Piezo Ignitor

109144-02 Air Baffle (Natural Gas Only)

108761-02

Grate Assembly

108346-01

Grate Base

11429

Pin

1

1

12

1

1

1

1

1

2

1

1

1

1

1

1

1

1

1

4

1

1

1

2

1

1

2

111906-01F

www.desatech.com

33

Image 33
Contents What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsProduct Features Product IdentificationLocal Codes Pre-Installation Preparation Location and space requirementsClearances Framing and finishing Framing Clearances for Installation Against an Exterior WallTermination CAP AIR Supply Inlet GAS Meter Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Horizontal Termination InstallationVent Pipe Connections Vent pipe before connecting horizontal run to vent cap see Ground Floor Installation Horizontal Termination ConfigurationsVenting with Two 90 Elbows Snorkel Termination InstallationOffset with Wall Strap and 45 Elbows Flat Ceiling InstallationVertical Termination Configurations Venting with One 90 ElbowVertical Venting High Altitude Installation Fireplace InstallationParts lists for venting kits and components Installing optional blower accessoriesAttaching Speed Control to Firebox Model BKT InstallationInstalling Gas Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Installation Items Needed Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Checking GAS ConnectionsPressure Testing Fireplace Gas Connections Installing Remote ReceiverCleaning Glass Door Installing Brick liner Models BL42DASA and BL42DHASARemoving/Replacing Glass Door Removing Louver PanelsInstalling Rear Brick Panel Installing logs, lava rock Glowing embersFor your safety read Before lighting Operating FireplaceLighting Instructions To Turn OFF GAS To Appliance Manual Lighting ProcedureOpTIONAL Hand-Held Remote OperationOperating optional blower accessory Thermostat Series Model HRC200Operating optional GWMT1 Wall Mounted Thermostat Pilot assembly Cleaning MaintenanceInspecting Burners Burner Flame PatternTo clean pilot. This can damage pilot unit TroubleshootingPilot and burners LogsTroubleshooting Above Gas leak. See Warning statementService Hints Replacement PartsTechnical Service SpecificationsAccessories Illustrated Parts Breakdown 108331-01 108331-02 109082-02 Parts ListIllustrated Parts Breakdown VV42PHB1 and CHDV24NR-B 111906-01F 111906-01F Keep this Warrant Warranty Information