Desa V42V-A installation manual Vent pipe before connecting horizontal run to vent cap see

Page 9

 

Venting Installation

 

 

instructions

Minimum Pipe

 

Continued

7.

Overlap 11/4"

Combustible Exterior Wall Only: Slide the wall firestop over

 

 

the vent pipe before connecting horizontal run to vent cap (see

 

8.

Figure 12).

Direct Vent

Carefully move fireplace, with vent assembly attached, toward

Pipe

 

wall and insert vent pipe into horizontal termination. The pipe

Wall

9.

overlap should be a minimum of 11/4".

Firestop

Combustible Exterior Wall Only: Slide wall firestop against

 

 

interior wall surface and attach with screws provided. See

 

 

Figure 13 for horizontal termination details.

 

10.

Place fireplace into position and shim with noncombustible

 

 

material if needed. Nail or screw side flanges to framing to

 

 

secure unit in place. IMPORTANT: Make sure fireplace is

 

 

level before securing. If fireplace is not level it will not work

 

 

properly.

Maintain 1"

 

 

Minimum Air

 

 

Space Around

 

 

Outer Pipe When

 

Cut Siding Away

Penetrating a Wall

 

 

 

to Fit Standoff

10 3/4" x 10 3/4"

 

Standoff

Framed Opening

 

Wood Screw

 

 

Vent Cap

 

Siding Standoff

Screws

High Wind

Termination

Apply Mastic to

Outside Edge of

Standoff

Exterior Wall with Vinyl Siding

 

Figure 13 - Typical Horizontal Termination Cap Mounting with

Screws

Additional Siding Standoff Installed

Apply Mastic to

All Four Sides

Figure 11 - Installing Siding Standoff

(Combustible Exterior Wall Only)

Interior Wall

Surface

Wall

Firestop

Vent Cap

Horizontal

(Horizontal

Vent Pipe

Termination)

 

Screw

Figure 12 - Connecting Vent Cap with Horizontal Vent Pipe

111906-01F

www.desatech.com

Image 9
Contents What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsProduct Features Product IdentificationLocal Codes Pre-Installation Preparation Location and space requirementsClearances Framing and finishing Framing Clearances for Installation Against an Exterior WallTermination CAP AIR Supply Inlet GAS Meter Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Horizontal Termination InstallationVent Pipe Connections Vent pipe before connecting horizontal run to vent cap see Ground Floor Installation Horizontal Termination ConfigurationsVenting with Two 90 Elbows Snorkel Termination InstallationOffset with Wall Strap and 45 Elbows Flat Ceiling InstallationVertical Termination Configurations Venting with One 90 ElbowVertical Venting High Altitude Installation Fireplace InstallationParts lists for venting kits and components Installing optional blower accessoriesAttaching Speed Control to Firebox Model BKT InstallationInstalling Gas Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Installation Items Needed Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Checking GAS ConnectionsPressure Testing Fireplace Gas Connections Installing Remote ReceiverCleaning Glass Door Installing Brick liner Models BL42DASA and BL42DHASARemoving/Replacing Glass Door Removing Louver PanelsInstalling Rear Brick Panel Installing logs, lava rock Glowing embersFor your safety read Before lighting Operating FireplaceLighting Instructions To Turn OFF GAS To Appliance Manual Lighting ProcedureOpTIONAL Hand-Held Remote OperationOperating optional blower accessory Thermostat Series Model HRC200Operating optional GWMT1 Wall Mounted Thermostat Pilot assembly Cleaning MaintenanceInspecting Burners Burner Flame PatternTo clean pilot. This can damage pilot unit TroubleshootingPilot and burners LogsTroubleshooting Above Gas leak. See Warning statementService Hints Replacement PartsTechnical Service SpecificationsAccessories Illustrated Parts Breakdown 108331-01 108331-02 109082-02 Parts ListIllustrated Parts Breakdown VV42PHB1 and CHDV24NR-B 111906-01F 111906-01F Keep this Warrant Warranty Information