ASSEMBLY
•Place bottom shelf between side panels with cut out hole for LP cylinder on left. Attach to left and right side panels with (4)
1 |
flange nuts at rear.
For Front Door
Brace Assembly
Right Side Panel
Rear
Left Side Panel
1/4"-20x2-3/8" Machine Screw Qty. 6
Front
Flange Nut
Qty. 6
Bottom Shelf
•Place lower back panel between side panels as shown. Attach to left and right side panels with (4)
2 screws. Then attach to bottom shelf with (2)
Magnet Assembly
#8-32x3/8"
Sheet Metal Screws
Qty. 6
Left Side Panel
Bottom Shelf
Right Side Panel
Lower Back Panel
17