Invacare RPS350-2 manual Assembling the Mast Actuator, Installing the Leg Actuator to the Base

Page 15

INSTALLATION

Assembling the Mast Actuator

CAUTION

DO NOT overtighten the nut and bolt. This damages the mounting bracket.

NOTE: For this procedure, refer to FIGURE 2.2.

1.Remove the top nut, top bolt, bracket, and bushing from the mounting bracket on the mast.

2.Position the mast actuator in the lift arm mounting bracket.

3.Install the top nut, top bolt, bracket, and bushing into the mounting bracket and mast actuator.

4.Tighten securely.

Mounting

Top Nut

Bracket

Bracket

 

 

Top Bolt

Bushing

Mast

Actuator

FIGURE 2.2 Assembling the Mast Actuator

Installing the Leg Actuator to the Base

NOTE: For this procedure, refer to FIGURE 2.3 on page 16.

1.Slide the leg actuator into the slot in the base of the lift. See Detail “B”.

2.Perform the following to secure the leg actuator to the pivot bracket (Detail “A”):

WARNING

Ensure that there is sufficient room to turn lift on its side and that floor area is clear of debris. Otherwise, injury to personnel or damage to lift may occur.

A.Turn the lift on its side.

B.Position slot in leg actuator over the pivot bracket.

C.Install the pin through the leg actuator and pivot bracket and secure with hitch pin.

D.Return the lift to the upright position.

3.Perform the following to secure the leg actuator to the mast bracket (Detail “B”):

A.Position leg actuator between mast bracket.

B.Move the legs to align the holes in the leg actuator with the holes in the mast bracket.

C.Install the pin through the holes of the leg actuator and mast bracket and secure with hitch pin.

4.Plug the pendant control into the bottom of the control box.

Image 15
Contents Stand Up Lift Model RPS350-2 Stand Up Lift Model RPS350-2 Table of Contents Register Your Product MaintenanceProduct Registration Form Fold here Cut Along Line Meaning Special NotesPatient Lift SpecificationsGeneral Guidelines Assembling the LiftOperating the Lift Using the Sling Lifting/Transferring the Patient Electrical Grounding Instructions Performing MaintenancePinch Points Installation IntroductionAssembling the Mast to the Base Assembling the Mast Actuator Installing the Leg Actuator to the BaseLift Components Mounting the Battery Charger Mounting the Battery ChargerOperating the Stand UP Lift Using the Pendant ButtonsRaising/Lowering the Stand Up Lift Performing an Emergency StopCharging the Battery Charging the BatteryPositioning the Stand Up Lift Lifting the PatientLifting the Patient Lifting the Patient Lifting the Patient Moving the PatientTransferring the Patient Transferring to a Commode Transferring to a CommodeTransferring to a Wheelchair Transferring the Patient to a Wheelchair Transferring to a BedTransferring the Patient to a Bed Symptoms Faults Solution TroubleshootingMaintenance Safety Inspection Checklist MaintenanceCleaning the Sling and the Lift Lubricating the LiftDetecting Wear and Damage Adjusting the Knee Pad Height Adjusting the BaseReplacing the Padded Cover Replacing the Knee PadReplacing the Mast Actuator Replacing the Mast ActuatorReplacing Rear Casters Replacing Casters/ForksReplacing Forks Maintenance Limited Warranty USA
Related manuals
Manual 2 pages 56.89 Kb