Dual Stationary Handrail Instructions
Stationary handrails remain in the upright (vertical position) at all times. Handrail access slots are provided in the lift housing cover. Access slots are incorporated in the vehicle floor or stairwell during lift installation procedures. The handrails travel in and out of
the access slots as the platform carriage assembly retracts and extends. Keep clear of the handrail access slots during lift operation.
WARNING
Stay clear of handrail access slots during lift operation. Failure to do so may result in serious bodily injury.
Stationary Handrails
Lift Housing
Keep clear of handrail access slots during lift operation.
Access
Slot
Cover with
Access Slots
Access Slot
Dual Manual Fold “P” Handrail Instructions
Folding “P” handrails are manu- ally operated. The handrails rest on the platform when the lift is not in use. The handrails must be folded down to the platform (horizontal position) before stowing the lift. The handrails are
Deployed
“P” Handrails
lifted to the vertical position and locked in position with a latch that automatically engages the platform bracket when fully raised. Lifting the round knob located on the vertical handrail tube disengages the latch.
WARNING
Fold handrails down before stowing lift. Failure to do so may result in serious bodily injury and/or property damage.
Stowed
Latch“P” Handrails
Knob
| LO |
|
| Y | |
P | Y |
|
| O | |
E |
|
|
|
| |
D |
| T |
|
| L |
|
|
|
| P | |
|
| S |
| E |
|
|
| O | D |
| |
|
|
|
| ||
|
| W |
|
|
|
|
|
| W |
|
|
|
|
| O |
|
|
|
|
| T |
|
|
|
|
| S |
|
|
Latch Knob
Page 13