Dual Manual Fold “U” Handrail (with Shield) Instructions
Folding “U” handrails (with safety shield) are manually operated. The handrails rest on the platform when the lift is not in use. The handrails must be folded down to the platform (horizontal position) before stowing the lift.
Note: The bridge plate (inboard roll stop) must be folded down to the platform (horizontal posi- tion) before the handrails are folded down.
The handrails are lifted to the
vertical position and locked in position with a latch that auto- matically engages the platform bracket when fully raised. Lifting the round knob located on the vertical handrail tube disengages the latch.
To Deploy Handrails:
1.Lift front (right)
handrail to |
|
vertical |
|
latched |
|
position. Be | UVL |
certain latch |
|
is engaged. |
|
To Stow Handrails:
2.Lift rear (left) handrail to
vertical |
|
latched | UVL |
position. Be | |
certain latch |
|
is engaged. |
|
Before stowing lift: | Inboard |
| Roll Stop |
1. Fold down | UVL |
| |
inboard roll |
|
stop (bridge |
|
plate). |
|
2. Lift round
latching knob to |
| |
disengage latch | UVL | |
and fold rear | ||
| ||
(left) handrail |
| |
down to plat- |
| |
form (horizontal |
| |
position). |
|
Latch
Knob
Latch
Knob
3. Lift round latching knob to disengage latch and fold front (right) handrail down to plat- form (horizontal position).
WARNING
Fold handrails down before stowing lift. Failure to do so may result in serious
bodily injury and/or property damage.
UVL
Page 14